Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />PropOsed Ea5ement Information <br /> <br />Describe the easement request and the purpose that it would serve (attach separate sheet if necessary): <br /> <br />The Colorado Water Conservation Board oreviously approved an easement atom! the South Platte <br />River to enable the Roxborough Park Metrooolitan District to construct and maintain a wastewater <br />interceptor Dioelinc. Near Bellevicw Avenue and the Frontage Road. an e~istin1'!. stonnwater pioeline <br />conflicts with the DTOOOSed wastewater DiDcline. The existine: stonnwater Dioeline rn~1 be relocated to <br />enable the construction of the OroDOSOO wastewater Diocline. This application requests an easement for <br />the relocated stonnwatcr oioelinc. <br /> <br />Easement RCQUe5t ReQuirements <br /> <br />(I) Has a site survey been completed by a licensed surveyor (yes or no)1 Yes. The easement request <br />will only be approved once the applicant has provided a copy of the site survey to the ewes staff <br />along with a legal description of the requested easanent parcel. <br /> <br />(2) Do you have an understanding of the relevant environmental regulations and required floodplain <br />permits for this area? Please explain. Attach a separate letter demonstrating awareness of and <br />compliance with applicable local, slate, and federal environmental and floodplain regulations. yg <br />See cover letter <br />(3) For all drainage easement requests, a site drainage study and drainage plan is required. <br />Is this a drainage easement request? (yes or no) ~ <br /> <br />(4) Easements within the lOG-year floodplain of the South Platte River (Chatfield Downstream <br />Channel Improvement Project) must include a hydraulic analysis completed by a qualified professional <br />engineer (Colorado license required) to demonstrate no adverse impacts to the 1 DO-year floodplain. <br />Is this site in the lOO-year flood plain? ~ <br /> <br />Has a hydraulic analysis been completed? ~ <br />If so, please attach the hydraulic analysis to this application. <br />(5) Please rad the following statement and sign below. <br /> <br />I have read the CWCB's Easement Guidelines for the Chatfield Do\\nstre:am Channel Improvement Projc:ct and <br />understand what is ~uired in order for my ~uest to be considered and possibly approved by the CWCB <br />Members at a regularly scheduled CWCB Board Meeting. <br /> <br />I have filled out this icationA6lhc best ~~..fy knowledge and have supplied all the required information. <br />,/' , /7.i::. <br />Signan= /J /' . '- Date: /~, - ~ <f - .::< 0e .;,- <br /> <br />Please provide any additional comments you may have, if necessary, regarding the easemen1 request (attach <br />separate letter or ol.hcr documentation that you feel would be beneficial for CWCB to review). <br /> <br />SOUTH PLA TIE RIVER ewCR EASEMEI\. REQUEST <br />CONTACT INFORMATION AND REQUIRED NOTIFICATION LIST <br /> <br />2 <br />