<br /> Contract Status Report
<br />. Contracts Completed During FY98-99 Date
<br /> Borrower Project Loan Amount Completed
<br /> 1 Buffalo Mutual Amend1 Increase loa 128,750 8/19/98
<br /> 2 Eagle Park Reservoir C Purch & Rehab Res. 7,492,520 9/6/98
<br /> 3 Farmers Pawnee Canal Rehab diversion stru 29,000 7/9/98
<br /> 4 Hawkeye Lateral Ditch Amend1 Increase loa 11,113 8/19/98
<br /> 5 Lyons, Town of Amend#1 Parity 0 9/9/98
<br /> 6 Preisser, Rodney Horsecreek Aug Wat 90,000 9/6/98
<br /> 7 South Platte Lower Riv Grant 240,000 8/1/98
<br /> $ 7,991,383
<br /> Projects In Contracting Process
<br /> Borrower Project Loan Amount Construction Status
<br /> 8 Boulder Left Hand Ditch Rehab Twin Lakes 50,000 10/1/984/16 AGO Drafting
<br /> 9 Chatfield South Water Purchase water right 500,000 9/15/98 6/25 AGO Drafting
<br /> 10 Fort Morgan, Town of Raw Water Pipeline 8,000,000 9/1/987/16/98 AGO Drafting
<br /> 11 Fort Morgan, Town of Amend2 Parity 0 8/25/98 To Borrower for review
<br /> 12 Greeley & Loveland Irri Rehab Equalizer Da 308,000 11/1/98 5/7 To Borrower to review
<br /> 13 Jefferson County Mountain Groundwat 50,000 9/15/988/15/98 AGO Drafting
<br /> 14 Julesburg Irrigation Dist Rehab.diversion stru 590,000 10/1/988/20/98 AGO Drafting
<br /> 15 Left Hand Ditch Co, Enlarge Spillway 560,000 6/1/98 8/7/98 To Controller to sign
<br /> 16 Northern Colorado Wat Purchase Wells & W 900,000 8/1/98 7/20/98 AGO Drafting
<br />. 17 Starkville Amend#1 Defer pay 0 6/1/98 8/3/98 Started drafting
<br />18 Weldon Valley Ditch Co Amend Final loan am 0 6/24 To Controller to sign
<br /> 19 Westem Mutual Ditch C Rehab check dam 100,000 8/1/98 9/3/98 To Borrower for Review
<br /> $ 11,058,000
<br />
<br />.
<br />
<br />Projects Awaiting Contracting
<br />
<br />Borrower Project
<br />20 Beaver Reservoir Co. Amend Amortize Feas St
<br />21 Blue Lake Owners Assn Raw Water irrigation syst
<br />22 Broomfield, City of GreaI Westem Dam Reh
<br />23 Castle Pines North Metro Di Amend Final loan amount
<br />24 Chipperfield Lane Ditch, Inc. Amend Final loan amount
<br />25 Cola Conveyance Channel Rio Grande Project SB94
<br />26 Cotton Creek Water Co. Rehab Cotton Creek Airti
<br />27 Craig, City of Elkhead Res (SB86)
<br />28 CWPDA Feas SIudy . Aug Progra
<br />29 Denver Museum of Naturai Grant Denver Basin Aquif
<br />30 DeWeese Dye Ditch Rehab Deweese Dam H
<br />31 Dolores Water Conservancy Feasibility Study
<br />32 Farmers Independent Ditch Amend#1 Final Loan Am
<br />33 Farmers Independent Ditch Amend Final loan amount
<br />34 Fort Collins & LaJimer Co. Dry Creek Fiood Basin S
<br />35 Fort Lupton, City of DJiIl Municipal Well (HB9
<br />36 Fort Lupton. City of Amend#2
<br />37 Georgetown, Town of Purchase Water Rights S
<br />38 Greeley & Loveland IrJigaIio Horseshoe Lake Outlet R
<br />39 Greeley, City of Rehab Twin Lakes
<br />40 Greeley, City of (C153633) Amend Final loan amount
<br />41 Greeley, City of (Commanch Amend Final loan amount
<br />42 Greeiey, City of (Peterson) Amend Final loan amount
<br />43 Highland Ditch Co. Rehab Foothills Res. HB
<br />
<br />Loan Amount Construction
<br />o 12/1/98
<br />900,000
<br />3,000,000 Possible DeauIhoJization
<br />o
<br />
<br />420,000 10/1197
<br />100,000 Possible DeauthoJization
<br />750,000 Possible DeauthoJiza1ion
<br />75.000 Possible DeauthoJization
<br />90,000 10/1198
<br />734,000 4/1/99
<br />112,500 12/1198
<br />o
<br />
<br />920,000 4/1/98
<br />354,000 Possibie DeauthoJization
<br />o
<br />206,250 12/1/98
<br />100,000
<br />787,500 Possible DeauthoJizatlon
<br />o
<br />o
<br />o
<br />1,040,000 11/1/98
<br />
<br />Prepared by Janis IIlian - Updated 9/15/98
<br />
|