My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00790
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:06 PM
Creation date
10/4/2006 6:44:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
CF Section - Additional Information on Approved Loans for New Projects - Highland Ditch Company
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />of the loan. <br /> <br />At the current time the State Engineer has the reservoir restricted to gage height 41 feet which <br />reduces the storage by 900 acre-feet. With time we believe the SEO will reduce the storage not <br />only due to the seepage and potential for failure, but may reduce the storage due to the spillway <br />wherein the design storm can be stored in the reservoir. This would require a storage margin of <br />1730 acre-feet. This would place the restriction at gage height 32 feet for a loss of 2255 acre-feet. <br />This is greater than the 1730 acre-feet required for the storm storage as the spillway is currently <br />at gage height 43.3 feet rather than the decreed height of 45 feet. <br /> <br />Based on the value of the water as stated, the following cost analysis is presented. <br /> <br />Total Project Cost Including Interest and the 25% Payment by the Company <br /> <br />$60,143 x 30 years + $350,766 = $2,155,056 <br /> <br />Using a rental rate of $50 per acre-foot for the water and the total project cost, <br /> <br />Benefit/Cost = $50 x 2,255 A-Ft x 30 yrs + $2,155,056 = 1.56 <br /> <br />Total Cost per Share of Stock <br /> <br />$2,155,056 + 725.5 = $2,970.44 <br /> <br />Cost Per Share of Stock Per Year <br /> <br />$ 2,970.44 + 30 years = $99 <br /> <br />Cost Per Acre-foot Of Water Delivered For An Average Year <br /> <br />$2,155,056 + 30 years + 3000 A-Ft =' $23.95 <br /> <br />The Cost Per Acre-Foot of Water Saved <br /> <br />$2,155,056 + 2,255 A-Ft = $956 <br /> <br />The cost of $23.95 per acre-foot water delivered in an average year is near the current value of <br />rental water in northern Colorado. However, rental water has been as high as $50 per acre-foot <br />over the past five years. The cost per acre-foot of water of $956 is approximately equal to the <br />current value of the water on today's market. <br /> <br />Based on the cost data presented above the project would appear to be feasible. If the dam is not <br />rehabilitated, the potential loss of water for 25,000 acres of irrigated land would be approximately <br /> <br />Foothills Dam- 96.014 <br /> <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.