My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00755
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00755
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:55 PM
Creation date
10/4/2006 6:43:53 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/24/2001
Description
CF Section - Policy #14 - Approval and Prioritization of Construction Fund Applications for Non-reimbursable Project Investments
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />218 <br /> <br />'. <br /> <br />j: <br /> <br />. <br /> <br />POLICY NUMBER: 14 <br /> <br />SUBJECT: <br /> <br />APPROVAL AND PRIORITIZATION OF CONSTRUCTION <br />FUND APPLICATIONS FOR NON-REIMBURSABLE <br />PROJECT INVESTMENTS <br /> <br />EFFECTIVE DATE: January 24, 2001 <br /> <br />POLICY: <br /> <br />The Colorado Water Conservation Board (CWCB) will accept <br />applications for non-reimbursable project investments from the <br />Construction Fund until August 31 of each year. <br /> <br />Applications for non-reimbursable project investments from the <br />Construction Fund will be accepted for the following types of <br />projects only: <br />1. <br /> <br />2. <br /> <br />Projects or studies of statewide impact or <br />importance. <br />. Feasibility studies and demonstration projects that <br />are designed to answer questions related to <br />statewide water issues or have significant potential <br />to result in loans from either the Construction Fund <br />or the Severance Tax Trust Fund Perpetual Base <br />Account. <br /> <br />. <br /> <br />The CWCB may, in any year, recommend approval to the General <br />Assembly any project in the above categories that the Board deems <br />worthy of funding through non-reimbursable investments. In order <br />to protect the long-tenn integrity of the Construction Fund, <br />Construction Fund loan applications are preferred over non- <br />reimbursable investment applications. <br /> <br />Approximately 10% of the annual funds available for non- <br />reimbursable investments will be set aside for feasibility studies <br />and demonstration projects. Feasibility study and demonstration <br />project investments will be limited to 50% of the total study or <br />project cost, up to a maximum of $100,000. The project applicant <br />must have completed a fully executed non-reimbursable <br />investment funding contract with the CWCB within 2 years of the <br />investment authorization by the General Assembly, or the Board <br />will consider de-authorization ofthe investment. <br /> <br />PURPOSE: <br /> <br />To establish an approval and prioritization process for non- <br />reimbursable investJl1ents from the Construction Fund. <br /> <br />. <br /> <br />APPLICABILITY: This policy and procedure apply to applications for non- <br />reimbursable investments from the Construction Fund. <br /> <br />JanO! item!2aPolicy#14.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.