Laserfiche WebLink
<br /> <br />Measurements <br />3 <br />Measurements <br /> <br />Measurements <br />5 <br /> <br />Prepare and <br />publish report <br /> <br />Total <br /> <br />A third set of discharge measurements will be made at high flow <br />(3,000-5,000 ft'!s) near the peak of high-elevation snowmelt. <br />A fourth set of discharge measurements will be made at medium <br />flow (1,500-3,000 ft'!s) during the high-elevation snowmelt <br />recession. <br />A final set of discharge measurements will be made at low flow <br />(500- 1,500 ft'!s) after snowmelt and before the end of agricultural <br />irri ation. <br />After all measurements have been completed and analyzed, results <br />ofthe measurements and the mass-balance analyses will be <br />incorporated into a report. The general relation of the streamflow <br />transit losses, or gains, to discharge in the study reach and to the <br />time of year will be evaluated, and the effects on streamflow transit <br />losses of any geologic, hydrologic or physical characteristics <br />observed durin the reconnaissance effort also will be described. <br /> <br />$ 7,700 <br /> <br />$ 2,300 <br /> <br />$ 5,400 <br /> <br />$ 5,960 <br /> <br />$ 1,770 <br /> <br />$ 4,190 <br /> <br />$ 6,180 <br /> <br />$ 1,830 <br /> <br />$ 4,350 <br /> <br />$ 43,390 <br /> <br />$ 12,930 <br /> <br />$ 30,460 <br /> <br />$ 112,940 $ 33,480 $ 79,460 <br /> <br />The USGS and CWCB have asked all parties interested in this study to assist in providing the required matching funds, <br />As of November 14,2002, approximately $20,000 is expected from the USBR and UCRRIP (Recovery Program). Other <br />entities such as the Colorado River Water Conservation District (CRWCD) and Upper Gunnison River Water <br />Conservancy District (UGRWCD) have expressed interest but have not yet committed any funds. <br /> <br />Therefore approximately $59,460 is needed to provide the necessary matching funds for this project. <br /> <br />Recommendation <br />Staff recommends that the Board request the General assembly authorize $59,460 from the Construction Fund to be <br />_propriated to provide the required matching funds for the USGS Gunnison River Streamflow Study. <br /> <br />e <br /> <br />Flood Protection . Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />