My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 09/13/1984
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
Board Meeting 09/13/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:44 PM
Creation date
10/4/2006 6:43:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/1984
Description
Agenda, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Mr. Danielson announced that his office had received <br />letters of interest in the system from the State of Texas, the <br />Bureau of Reclamation, the City of Colorado Springs, and the <br />Denver Water Department. <br /> <br />2. <br /> <br />Rio Grande Compact - Compact debit reduced about <br />93,000 acre-feet in the current water year. <br /> <br />3. <br /> <br />Allocation of Closed Basin Project water <br /> <br />Mr. <br />the Rio <br />project <br /> <br />Danielson recommended that the Board should encourage <br />Grande Water Conservation District to allocate the <br />water. <br /> <br />4. <br /> <br />Subordination of water rights to water stored in Blue <br />Mesa Reservoir by Bureau of Reclamation. <br /> <br />Aqenda Item 10 - Development Authoritv's Report <br /> <br />Mr. uli Kappus, Associate Director, Development Authority, <br />reported on the following: <br /> <br />1. Status of Satellite Monitoring System installation. <br /> <br />2. St. Vrain Study - Step 2 of the study approved. <br /> <br />3. Status of study on Green Mountain Exchange Project. <br /> <br />4. Status of San Luis Valley Aquifer System Study. <br />Meeting to discuss study schedule for September 18, <br /> <br />1984. <br /> <br />Aqenda Item 11 - South Platte Channel Proiect--Resolution <br />Authorizinq Riqht of Entrv <br /> <br />In his discussion of this item, Mr. McDonald stated that <br />the legislation authorizing the Chatfield Darn and <br />Channelization of the South Platte River provided that the <br />State acquire the rights-of-way for the channel project. The <br />Board is acquiring the lands needed and, previously by <br />resolution, granted the Corps of Engineers right-of-entry to <br />lands included in State 1 of the project. Right-of-entry is <br />now required for the remainder of the lands. Board action is <br />necessary to accomplish this. <br /> <br />Mr. Robbins moved, seconded by Mr. Lochhead, that the Board <br />approve the proposed resolution presented by the staff. The <br />motion was approved unanimously. (Appendix E attached) <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.