My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00718
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:29 PM
Creation date
10/4/2006 6:43:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
Flood Section - Chatfield Reservoir Drought Declaration
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />'. <br /> <br />. <br /> <br />. <br /> <br />e: <br /> <br />e <br />"'v 't. <br />Fl. NO.;;/ I DOC. NO. /1;' ! <br /> <br />twenty (20) days f~om the date that the water level in thatfie'Q <br /> <br />Reservoi.r at-1;.ai05 elevation 5.42b'.fjI". feet above mean sea <br /> <br />level for the maintenance and, operation o~ the reservoir in <br /> <br />accordance with this agreement; provided, however, that <br /> <br />such sum. shall not be due and payable and this contract <br /> <br />shall be null and void unless said sum is made available to <br /> <br />the Division of Pa~k5 and Outdoor Recreation durin~ the <br /> <br /> <br />1979 session of the Colorado Ge~eral' Assembly. <br /> <br /> <br />b. Convey to the Contractor by quit eta,lm deEd or <br /> <br />stock c~rtificate, as ~ppropriate, the fol1ow.ng waler rights <br /> <br />from the South Platte River now claimed by the State: 365 <br /> <br />ncre riQhlS out of 'the Highline Canal of the Nor~hern Irri- <br /> <br /> <br />qation Company, Ib~l shares of the Last Chance Ditch Company <br /> <br />No.2, 57.87 acro r:lghts of the Antero and ,Lost Park 'Reser- ,,_ <br /> <br /> <br />voir Comp&~y, and ~ll of the State's storage rl9h~s in,Chatfield~ <br /> <br />Reservoir. <br /> <br />c. Activel_y assist the Co'ntractor -in negotiatinQ <br /> <br />any agreements with the Corps ,of Engineers,-united States <br />, . <br /> <br />Army. which may be ~ecessary' to carry out the purposes and <br /> <br />intent of tnts con~~act. <br /> <br />d. Grant t:o the ,Contractor 10.70S. acre-feet of oper- <br /> <br />ating stor~ge capa~ity [or Co~tractor's sole and exclusive <br /> <br /> <br />use in regulating, w_ater .supplies in Chatfield Reservoir <br /> <br />upon the de~e9atio~'to the State by the Corps of Engineers <br /> <br />i <br />of operationa~ aut~ority and responsibility ~itn respect to <br /> <br />the waters i~ said ireservoir betweon elevations 5,432 feet <br /> <br /> <br />and 5,423 feet abov~ mean sea level. <br /> <br />e. Grant too the Contractor any rights-or-way or <br /> <br />easements on '01" acruss any lands owned or controlled by the <br /> <br /> <br />State as may be, required to effect the relocation of Contrac- <br /> <br /> <br />tor's conduits as d'esc.ri'bed In, sUbParagr.aph l.c. of this <br /> <br />e <br /> <br />contract. <br /> <br />3. Capacity. st~rage and evaporation in and from Chatfield <br /> <br /> <br />R~s~rvoir sh~11 be determined from daily d~ta made <br /> <br />Pas' b of 13 page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.