My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00718
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:29 PM
Creation date
10/4/2006 6:43:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
Flood Section - Chatfield Reservoir Drought Declaration
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.:., <br />.;)'. <br /> <br />~ <br /> <br />. <br /> <br />" <br /> <br />~;- <br /> <br />-~ <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />'.' <br /> <br />, Fr""~o. JFI DOC, NO. I~ 4 <br /> <br />and Chatfield ~eservoir. <br /> <br />~OWt THEREFORE, in consideration of the respective <br /> <br />promises and aqreement~ hereinaft~r set forth "the-State and <br /> <br />the Contryctor agree DS fo110W5: <br /> <br />1. Tne Contractor shall: <br /> <br />D_ upon notice to proceed given in writing by the <br /> <br />State, initiate and diliqentl.y carry to completion appropri- <br /> <br />ate exch~nge ~roced~res as may be permitted by law and such <br /> <br />court ~(ocecdings as. may be necessa~~ to change sufficient <br /> <br />of its decr~ed direct flow and storage rights so as to permit <br /> <br />the type of regulation and re-regulation contemplated herein. <br /> <br />-and will. ujJon successful compl~.tjon thereof.,so r.e:9ulat~ <br /> <br />the flow of water into and out of Chatfi~ld Reservoir as to <br /> <br />cause watt!r storase tnerein to be maintained between el.eva- <br /> <br />tions ;,432 feet and 5,423 feet above mean sea level, and <br /> <br />the Sta~e a9rees not" to oppose the Contractor i n t~e prose- <br /> <br />cution of said judicial oroceedings to completion. To ~he <br /> <br />~xtent l~gally possible, said amount of storage shall De <br /> <br />attained within a periOd of not more than two year~ from <br /> <br />tlte date of notice to proce~d, except as a longer time m~y <br /> <br />be required f~r successful completion of said exchange or <br /> <br />Juaicial.proceedings. <br /> <br />o. After such initial filling as hereinbefor~ de- <br /> <br />s'ribed and during the useful life of Chatfield ~eservoir. <br /> <br /> <br />for tne purposes described in this contract, continue to <br /> <br />reyulate the flows of water entering C.hatfield Res~rvoir <br /> <br />trom time to time.as may be necessary to prevent wast. of <br /> <br />wat~r appropriated for municipal purposes, to replace evapo- <br /> <br />ration losses fronl the reiervoir, and otherwise to carry <br /> <br />out .tnc purposes of this. -contracti provided tha-t: <br /> <br />1) Contractor shall have the sole and exclusive <br /> <br />right to regulate for its own uses and purposes <br /> <br />the amount of water stored in the reservoir <br /> <br />between the lower limit of 15,349 acre-feet {ele- <br /> <br />Pa3e 3 of 13 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.