My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00718
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:29 PM
Creation date
10/4/2006 6:43:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
Flood Section - Chatfield Reservoir Drought Declaration
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..' <br /> <br />e <br /> <br />e) <br /> <br />e <br /> <br />'. <br /> <br />) <br /> <br />'upon request. Project operational and other hydrologic data will be <br /> <br /> <br />freely exchanged at all times directly between the State Engineer an"-' <br /> <br /> <br />the Reservoir Superintendent. The Superintendent's log will also note <br /> <br /> <br />the reservoir release orders given him by the State Engineer and will <br /> <br /> <br />serve as a record of such orders in the absence of other written <br /> <br /> <br />communication. The State Engineer will certify the accuracy of the <br /> <br /> <br />log when requested by the Government. <br /> <br /> <br />b. State Responsibility. The State Engineer will be responsible <br /> <br /> <br />for the accounting of all waters stored in the conservation :a:one of <br /> <br /> <br />the reservoir. The State Engineer will also be responsible for <br /> <br /> <br />determining the desired level of the conservation pool and the release <br /> <br /> <br />rates necessary for downstream i=igation requirements. The State <br /> <br /> <br />Engineer may issue oral and/or written orders directly to the Reservo.ir <br /> <br /> <br />Superintendent for release to be made from the conservation pool. o. <br /> <br /> <br />orders will be confirmed in writing as soon thereafter as practicable. <br /> <br /> <br />Conflicts regarding release orders will be mutually resolved by the <br /> <br /> <br />Government and the State Engineer. <br /> <br /> <br />c. Government responsibility. The District Engineer I Omaha <br /> <br /> <br />District, will issue flood control release orders directly to the <br /> <br /> <br />Reservoir Superintendent. A copy of the written order will be furnished <br /> <br /> <br />to the State Engineer. <br /> <br /> <br />Article 10. Operation and Maintenance. The operation and <br /> <br /> <br />maintenance of all physiqal features of the project not otherwise <br /> <br /> <br />specifically assigned or leased to the State will be the responsibil- <br /> <br />ity of the Government. <br /> <br />-10- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.