Laserfiche WebLink
<br />the Basin Canal, and the Paradox Canal heading on the West Fork of Dry <br />Creek pelow the outlet of Radium Reservoir. The Mailbox Park Canal <br />would b~at1.ch northwest from the Norwood Canal and the Long Park lateral <br />would branch from the Paradox Canal. Other distribution laterals and <br />land drains would be provided as needed. Existing reservoirs and <br />distribution systems would be integrated with the project irrigation <br />system and exchanges effected to bring project water to some lands above I <br />project works. <br /> <br />Municipal and industrial water would be made available in the San Miguel <br />River and in the Naturita and Radium Reservoirs. The industrial water <br />would be used to develop the natural resources of the area,.which <br />include coal, oil, potash, gypsum, timber, uranium, vanadium, copper, <br />lead, zinc, silver and gold. It is anticipated that 20,000 acre-feet <br />per year will be needed by 1980 and 44,000 acre-feet per year by 1990. <br />Recreational facilities would be provided at the three project reser- <br />voirs. The Saltado Reservoir would be operated for flood control on <br />the basis of runoff forecasts. Measures for fish and wildlife would <br />include maintenapce of minimum flows and channel improvements in the <br />river belowSaltado Reservoir, provisions for two inter~connected <br />sections at Radium Reservoir and control of water elevations for water- <br />fowl in the east section, a 200-acre irrigated waterfowl preserve <br />adjacent to Radium Reservoir, and sport fisheries at each project res- <br />ervoir. <br /> <br />Project Statistics <br />Feasibility Plan <br /> <br />~ect cost (Jan. 1975 prices in dollars) <br /> <br />Saltado Dam and Reservoir <br />Naturita Dam and Reservoir <br />Radium Dam and Reservoir <br />Paradox Diversion Dam <br />Norwood Canal <br />Mailbox Park Canal <br />Basin Canal <br />Paradox Canal <br />Laterals <br />Drains <br />Permanent operating facilities <br />Total construction cost <br />Interest during construction <br />Total investment . <br /> <br />35,787,000 <br />10,931,000 <br />6,2~6,000 <br />571 ,000 <br />37,053,000 <br />915,000 <br />8,349,000 <br />9,7~1,000 <br />12,266,000 <br />4,718,000 <br />1;~06,000 <br />127, 23,OUO <br />8,308,000 <br />136, 131, OUO <br /> <br />Annual operation, maintenance <br />and replacement <br /> <br />Municipal and industrial water (acre-feet/year) <br />To besupp~iedfrom: <br />Radiiun Reservoir <br />Naturita Reservoir <br />Saltado Reservoir <br />Total <br /> <br />270,000 <br /> <br />I <br /> <br />7,000 <br />7,000 <br />30,000 <br />44,000 <br /> <br />-24- <br />