Laserfiche WebLink
<br />26a. Water Project Construction Loan Program - Non-Reimbursable studies and <br />Investigations - Rio Grande Decision Support System - Year 2 Development <br />Tape 5, Start/Stop: 3626 - 3972 <br />Action: A motion was made by Alan Hamel to accept the staff recommendation to <br />recommend to the General Assembly that $2,983,380 for RGDSS Years 2 <br />and 3, and 2.5 FTEs and $175,000 to the State Engineer's Office, for a total <br />of $3,158,380 be made available from the Construction Fund for the Rio <br />Grande Decision Support System project continuation. The motion was <br />seconded by Patricia Wells and approved unanimously (8-0). <br /> <br />26b. Water Project Construction Loan Program -Non-Reimbursable Studies and <br />Investigations - Satellite Monitoring System Maintenance <br />Tape 5, Start/Stop: 3972 - 4050 <br />Action: A motion was made by Janice Sheftel to accept the staff recommendation to <br />recommend to the General Assembly that $120,000 from the Construction <br />Fund be allocated to the State Engineer's Office for the continuation of the <br />Satellite Monitoring System in FY 99-00. The motion was seconded by Bob <br />Burr and approved unanimously (9-0). <br /> <br />26c. Water Project Construction Loan Program - Non-Reimbursable Studies and <br />Investigations -Imaging System for Construction Fund Project Files <br />Tape 5, Start/Stop: 4050 - 4427 <br />Action: A motion was made by Patricia Wells to accept the staff recommendation to <br />recommend to the General Assembly that up to $270,000 from the <br />Construction Fund be appropriated to DNR to combine CWCB efforts with <br />the State Engineer's Office and Oil and Gas Commission efforts to set up a <br />document imaging system. The motion was seconded by Bob Burr. The <br />motion was amended with the suggestion that the wording "in FY 2000" be <br />deleted and that the funds be available until the project is completed. The <br />amended motion was accepted by both the first and second, and approved <br />unanimously (9-0). <br /> <br />26d. Water Project Construction Loan Program -Non-Reimbursable Studies and <br />Investigations - South Platte DSS Scoping and Design <br />Tape 5, Start/Stop: 4427 - 4625 <br />Action: After much discussion on whether the CWCB and SEO are ready to begin <br />work on this project, this item was tabled until the January meeting. <br /> <br />26e. Water Project Construction Loan Program - Non-Reimbursable Studies and <br />Investigations - Statewide Floodplain Management Criteria Manual <br />Tape 5, Start/Stop: 4625 - 5241 <br />Action: A motion was made by Patricia Wells that the Board should support this <br /> <br />Minutes November 23-24, 1998 <br />