Laserfiche WebLink
<br />12 <br /> <br /> <br />several potential projects in Colorado. The Forum has II-Iso created a subcommittee to begin . <br />examining the implications and advantages of getting the salinity control program more closely <br />involved with efforts to control selenium loading in the Basin. Copies of the final Review Report are <br />available upon request. <br /> <br />Colorado River Basin Salinity Control-Advisory Council Report: The Colorado River Basin <br />Salinity Control Advisory Council is the federally chartered body that gives advice to the federal <br />agencies participating in the salinity control program. :The Council basically consists of Forum <br />members from each of the seven Basin States, but meets under more formal requirements for notice <br />and minutes. The Council met in San Diego on October 29 and 30, 2003, and is in the process of <br />finalizing its report presenting findings and recommendations to the federal agencies. The major <br />recommendations are for federal funding in FY 2004 and 2005. The US Dept. of Agriculture will <br />seek between $13.8 and 25 million, the us Bureau of Land Management $ 5.2 million, and the US <br />Bureau of Reclamation $17.5 million. These funding levels are consistent with prior year <br />recommendations, but higher than the funding actually provided by Congress in recent years. Board <br />staff plans to prepare letters from the Director to the relevant Congressional Appropriations <br />Committees supporting the Advisory Council's funding recommendations. <br /> <br />Colorado River Salinity-EQIP Funding: The Natural Resources Conservation Service (NRCS) <br />delivers USDA's portion of the salinity control program through the Environmental Quality <br />Incentives Program. (EQIP). EQIP was re-authorized in the 2002 Fann Bill and proposed nationwide <br />funding at significantly increased levels. The Salinity Control Forum anticipates a corresponding <br />(300-500 percent) increase in funds for salinity control in the Colorado River Basin if Congress <br />appropriates funds at authorized levels. . <br /> <br />The Forum has been working with the NRCS, state agencies, and local water User groups to design a <br />program capable of utilizing the increased funds. In Colorado there is an effort underway to do <br />planning studies to support new salinity control projoots in the Mancos, Rifle, Whitewater, DeBeque, <br />and Plateau Valley areas. In addition we have been working with the Colorado Soil Conservation <br />Board to provide enhanced technical assistance and accelerated program delivery in the existing. <br />salinity control areas (Cortez, Montrose, Delta, and Gtand Valley). <br /> <br />Yuma Desalt Plant: The Lower Colorado Region of~eclamation is working on a report to Congress <br />that looks at alternatives to operating the YDP and al~o seeks funding to upgrade and operate the <br />YDP. Staff has been involved in these ongoing discussions. One of the alternatives under discussion <br />is for Reclamation to enter into voluntary forbearanc~ agreements with agricultural users, including <br />agricultural users in the Upper Basin. This is of significant concern and certainly has many issues <br />associated with it. We will discuss this further with the Board at the meeting. <br /> <br />Coordinated Long-Range Operating Criteria Review: Reclamation began the 6th five-year review <br />of the Coordinated Long-Range Operating Criteria in March 2002. 12 of the 16 letters received <br />indicated no changes were required. Most of the chaJ;1ges requested in the other letters related to <br />additions that some felt were necessary to reflect legislation passed or rules promulgated since the <br />Criteria were adopted in 1970. Public consultation m;eetings were held in September and <br />Reclamation continues to discuss internally whether io propose changes to the Criteria. Once a <br />decision is reached, a Federal Register Notice will be' issued containing Reclamation's response and <br />including any proposed changes. The Notice is now expected to be completed in March or April. It <br />has been rumored that environmental groups are giving a high priority to filing a lawsuit concerning . <br />the Criteria. <br />