My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00707
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:22 PM
Creation date
10/4/2006 6:43:09 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2001
Description
ISF Section - Town of Basalt De Minimis Finding, Case No. 5-00CW252
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />I. The State Engineer Office's Analytical Stream Depletion Model used to <br />perform these analyses is sensitive to changes in pumping rate; therefore, the <br />delayed well depletion factors are distributed differently with an increase or a <br />decrease in the pumping rate. The increased diversions during June and July <br />increased the depletion factors for these two months (when Basalt has upstream <br />augmentation water available to it), but decreased the depletion factors for the <br />remaining months, especially during November and April, when Basalt's <br />augmentation plan is not capable of providing replacement water. <br /> <br />2. The increased depletions due to increased pumping rate during June and July <br />were offset by available consumptive use credit during the same months. <br /> <br />Applicant's consulting engineer believes that Basalt's monthly diversions will not <br />substantially change even though there will be periods when Well No. 13 may be pumped <br />at a rate of 404 gpm during June and July. As in Case No. 90CW138, the Town of Basalt <br />will provide adequate replacement water to augment the depletions to instream flow water <br />rights on the Frying Pan River and Roaring Fork River downstream of the confluence with <br />the Frying Pan River. <br /> <br />Staff Recommendation <br />The Staff recommends that the CWCB: <br /> <br />I) Find that the Town's change in operations is still de minimis to the Roaring <br />Fork River upstream of the confluence of the Frying Pan River and the Roaring <br />Fork River; and, <br />2) Enter the maximum potential depletion values in the de minimis database, <br />despite the Applicant's claims that it will rarely pump 404 gpm. That value is <br />for 3.63 aflyr for the Roaring Fork River, assuming Well No. 13 will be <br />pumped at a constant rate of 404 gpm during the entire months of June and <br />July. <br /> <br />5.00cw252 town of basalt deminimis request board memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.