Laserfiche WebLink
<br />Agenda Item 6i <br />Case No. 4-98CW214; Silver Mountain Industries, Inc. <br /> <br />Aoolication Summary <br /> <br />This is an application for a plan for augmentation, groundwater, surface and storage water rights <br />on Bilk Creek and the San Miguel River near the Town of Telluride in San Miguel County (see <br />attached map). Applicant seeks to augment out-of-priority depletions associated with the Bilk <br />Creek Wells Nos. 1 through 11 and Silver Mountain Valley Parcel Well No. 1 with releases from <br />Bilk Creek Pond. Applicant proposes to fill Bilk Creek Pond using water from either the Bilk <br />Creek Spring or the Bilk Creek Ditch and Pipeline. All water rights, including the spring and <br />ditch, have an appropriation date-ofDecember 29, 1998_ <br /> <br />CWCB Aoorooriations <br /> <br />The Board has the following instream flow appropriations which could be injured by this <br />application: <br /> <br />Case No. <br />4-84CW433 <br />4-84CW429 <br /> <br />Stream <br />Bilk Creek <br />San Miguel River <br /> <br />Amount(cfs) <br />3 cfs <br />20 cfs <br /> <br />AODrOoriation Date <br />7/13/1984 <br />7113/1984 <br /> <br />Potential for Iniury <br /> <br />The Applicant's proposed plan for augmentation may not replace the depletions to the Board's <br />instream flow water rights on the San Miguel River and Bilk Creek in the same time, amount or <br />location at which they occur. <br /> <br />Other Objectors <br /> <br />Other objectors include the San Miguel Board of County Commissioners. <br /> <br />J:\wctranslsecclcase filcs\498cw214",mcm,doc <br />