Laserfiche WebLink
<br />Town of Keenesburg <br />March 21-22, 2006 <br /> <br />Agenda Item 17c <br /> <br />Transporting the Roggen well water to the Town would require two lift stations. The estimated cost _ <br />of this alternative is approximately $2.6 million. This alternative would bring additional water _ <br />quantity to the Town for future growth, but would not result in a significant improvement in the <br />Town's current water quality. <br /> <br />Selected Alternative 2, Purchase PV Water - The selected alternative is the purchase of 139.6 <br />AF of well water rights in the Lost Creek Groundwater Basin, construction of a new replacement <br />well with a variable speed pump, construction of 5.5 miles of 8" transmission pipeline to the Town, <br />and completion of the water biending facility at the Town's existing water tank. <br /> <br />The Total Project cost is estimated to be: <br /> <br />TOTAL <br /> <br />$1,116,800 <br />911,480 <br />157,230 <br />136,690 <br />$2,322,200 <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br />Water Rights Purchase <br />Construction - Pipeline, Well, Structures <br />Engineering <br />Contingency (15%) <br /> <br />Schedule - The purchase of the water rights Is expected to occur with the next 90 days, and the <br />overall project is expected to be completed in late 2007. <br /> <br />Financial Analvsis <br /> <br />The total estimated cost of the project is $2,322,200. The Town qualifies for the Municipal Middle- <br />Income interest rate, and staff is recommending a maximum loan amount of $1 ,508,000 (65% of the - <br />estimated project cost) for 30 years at an interest rate of 3.75%. The Town will pay the 35% local ., <br />share ($814,200) of the project cost using existing reserve water funds. <br /> <br />Table 1 is a summary of the financial aspects of the project. A CWCB Loan of $1,508,000 would <br />have an annuai payment of $93,038 (including the 10% reserve requirement) at the loan terms of <br />3.75% for 30 years. <br /> <br />Table 1. Financial Summary <br /> <br /> <br />in 2007 <br /> <br />$2,322,200 <br />461 <br />$1,508,000 <br />$93,038 <br />$22 <br />$30 <br />$16.82 <br />$666 <br /> <br />) <br /> <br />Table 2 shows the Financial Ratios and indicates overall average to strong ability to repay the <br />$1,508,000 CWCB loan, with the Increased water rates. <br /> <br />e <br /> <br />Page 4 of6 <br />