My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 11/16/2004
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
Board Meeting 11/16/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:53 PM
Creation date
10/4/2006 6:42:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/16/2004
Description
CF Section - Non-Reimbursable Investments - Town of Florence - Oak Creek Reservoir Feasibility Study
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />.,...,,,,;~;o.:,,.-..(. <br /> <br />e <br /> <br />e <br /> <br />(a) A brief description of the project.. <br />(b) References to applicable publications, site visits, and foundation <br />reports. <br />(c) A description of areal and site geologic conditions. <br />(d) A description of all investigations and testing conducted. Testing <br />methods will be referenced. <br />(e) A description of the project site, including relevant surface features <br />and subsurface conditions. <br />(1) A description of ground water conditions. <br />(g) Stability Analysis. <br />(h) Seepage Analysis. <br />(i) Foundation Consolidation (as applicable) Analysis. <br />G) Engineering design recommendations will be provided for the <br />following details: <br />Cross-sections, <br />Slope protection, <br />Temporary and permanent slopes, <br />Excavation methods and equipment, <br />Structural subdrainage design, including filter cloth and gradation <br />of granular filters, . <br />Possible effects of excavation on adjacent structures and <br />recommendations concerning temporary and permanent shoring, <br />Foundation parameters for structures, and <br />Materials description, availability and usage. <br />(k) Plates will include the following: <br />Field logs on borings, <br />Plan of borings, <br />Summary of laboratory testing results. <br /> <br />d. Quality Control. <br /> <br />The quality control (QC) processes described in the QC Plan will be performed for all work, <br />including an independent technical review of all products. <br /> <br />2.5 HTRW INVESTIGATIONS. An initial assessment will be conducted for the entire project <br />area. The assessment will address th~ existence, or potential for, hazardous toxic and radioactive <br />waste (HTRW) contamination on lands, including structures and submerged lands, in the study <br />area, or external HTRW which could impact the project. The initial assessment will be based on <br />existing documents, interviews, and observations gathered during the conduction of the site visit. <br />A review of the existing and past property uses will be conducted to determine the likelihood of <br /> <br />SECTION B, PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.