My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00628
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:34 PM
Creation date
10/4/2006 6:41:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/2004
Description
CF Section - Fulton Irrigation Ditch Company
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.- <br /> <br />Fulton Irrigation Ditch Company <br />March 17, 2004 <br /> <br />Agenda Item 25b. <br /> <br />. <br /> <br />\Vater Project Construction Loan Program-Project Data <br /> <br />Borrower: Fulton lnigation Ditch Company <br /> <br />Count)': Adams <br /> <br />Project ~ame: Fulton Ditch Spillway Repair <br /> <br />Project Type: Diversion Rehabilitation <br /> <br />Drainage Basin: South Platte <br /> <br />'Vater Source: South Platte River <br /> <br />Total Project Cost: 5200,000 <br /> <br />Funding Sources: Company and eWeB <br /> <br />Type of Borrower: AgriculnrrallMunicipal <br /> <br />Interest Rate: 2.8% <br /> <br />CWCB Loan: 5170,000 (Includes Org. Fee) <br /> <br />Term: 20 years <br /> <br />Average Annual Volume of 'Vater dh!erted: 30,666 AF <br /> <br />. <br /> <br />The Fulton Irrigation Ditch Company (FlOC), located in Adams County, owns and operates the <br />Fulton Irrigation Ditch to deliver direct flow inigation water for the benefit of the 220 shareholders. <br />Water is diverted from the South Platte River, located about 5 miles southwest from the City of <br />Brighton, to a 37,628 acre service area. The FIDC is applying for a loan in the amount ofSI70,OOO <br />to make repairs to their existing diversion structure. The estimated total cost of the project is <br />$200,000, which involves the placement of steel sheet piling upstream and dO\lmstream of the <br />existing spillway structure, with a concrete pile cap, and the placement of pressurized grout in the <br />existing stilling basin to fill any existing voids. <br /> <br /> <br />, <br /> <br />i <br /> <br />" <br />"'~ . <br />" <br />- - <br />" <br />"-'--, <br /> <br />. <br /> <br />:::;?-Jf ~\- <br /> <br /> <br />Location Map <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.