My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00614
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:28 PM
Creation date
10/4/2006 6:41:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
ISF Section - Instream Flow Appropriations - Escalante Creek
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado, Water Resources Investigations Report 85-4086, 1985) that apply to the Uncompahgre <br />Plateau and Glade Park based on basin drainage area, mean annual precipitation, mean basin <br />elevation and mean basin slope. The report "Uncompahgre Plateau and Glade Park Annual <br />Hydrograph Estimation" in Appendix C, explains staff's water availability analysis in more <br />detail. Table 2 below displays the estimated stream flow of Escalante Creek. <br /> <br />For the upper reach, the synthetic hydrograph shows that the summer flow recommendation of <br />11.5 cfs is available only from April 1 to June 30. The summer flow recommendation was <br />reduced to 3.2 cfs for the time period of July 1 through July 31 based on limited water <br />availability. Table 2 also shows that the winter flow recommendation of 3.2 cfs is only available <br />at least 50% of the time from March 1 through March 31. The winter flow recommendation was <br />further reduced to 1.3 cfs for the period of August 1 to February 28 based on limited water <br />availability . <br /> <br />(cfs) <br /> <br />Table 2: Estimated Stream Flow on Escalante Creek (upper reach): <br />Jan Feb Mar Jun <br /> <br />Dec <br /> <br />20 <br /> <br />15 <br /> <br />lJ) <br />U 10 <br /> <br />Jul <br /> <br />Oct <br /> <br />Nov <br /> <br />Estimated Stream Flow on Escalante Creek <br />(upper reach) <br /> <br />5 <br /> <br /> <br /> <br />o <br /> <br />Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nov Dee <br />Month <br /> <br />Table 3: Estimated Stream Flow on Escalante Creek (lower reach): <br /> <br />(cfs) <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.