Laserfiche WebLink
<br />If <br /> <br />, <br />. <br /> <br />Agenda Item 23 f <br />March 20-21, 2000 Board Meeting <br />Page 12 of 12 <br /> <br />e <br /> <br />Exhibit A <br />Operation Needs <br /> <br />Define the release period. <br /> <br />_ Assure that the release plan is designed within the operational and environmental <br />constraints of the reservoirs, as determined by the facility owners, including dam <br />safety, maintenance requirements, recreation, fisheries, downstream inundation, <br />and water rights. <br /> <br />The first priority for use of the outlet capacity at the reservoirs must be for water <br />supply purposes. Recovery Program releases must be made such that the outflow <br />from the reservoirs will not exceed the safe and normal operating capacity as <br />determined by the facility owners. <br /> <br />_ Develop a scheduling procedure that meets the advance notice needs of the <br />facility owners. <br /> <br />e <br /> <br />e <br /> <br />i......._._ <br />