My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00561
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:57 PM
Creation date
10/4/2006 6:40:37 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/24/2003
Description
CF Section - New Loans - Glenn D. Toyne - Well Augmentation Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Glenn D. Toyne - Well Augmentation Project <br />March 25-26. 2003 <br /> <br />Agenda Item 24d <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />e <br /> <br />Borrower: <br /> <br />Glen O. Toyne (GOT) <br /> <br />coJnty: Sedgwick <br />Project Type: Well Augmentation <br /> <br />Project Name: Toyne Recharge Project <br /> <br /> <br />Drainage Basin: South Platte <br /> <br />Total Project Cost: $115,000 <br /> <br />Water Source: New wells <br /> <br />Funding Sources: CWCB <br /> <br />CWCBSmall Project Loan: $75,600 <br /> <br />Aver. Delivery: 3500 acre-feet <br />Interest Rate: 2.75% Term: 30 years <br /> <br />Type of Borrower: Agricultural <br /> <br />GOT is a private family farm located 14 miles south ofJulesurg in Sedgewick County. GOT has <br />approximately 517 acres of irrigated farm ground. There are 8 tributary groundwater wells, which <br />were drilled in the late 1960's and early 1970's. The wells pump on average 1100 acre-feet <br />. annually, The water is typically used to irrigate corn, alfalfa, beans and wheat. The 8wells are <br />currently augmented under the Groundwater Approprii'ltors of the South Platte (GASP) plan of <br />operation GOT is completely dependent on their 8 wells, which have very junior water rights. GOT <br />has been using GASP to replace depletions from well, pumping when there is a senior water right <br />"call" on the river. GOT plans to construct a well to pllmp water into a recharge pond in the winter <br />months when there is not a call on the river. Water from the pond would have a delayed return to <br />the river in summer months when GOT has depletions that need to be offset with augmentation . <br />water. The well, drilled near the South Platte River, would pump up to a rate of 7.8 ofs, producing <br />up to 3500 acre feet annually. They would pump to the recharge ponds through 15 " underground <br />piping. An additional well for augmentation would bEl drilled near the recharge pond, and the piping <br />used to return "stored" water to the river when necessary. <br /> <br /> <br />e <br /> <br />Location Map <br /> <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.