My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00538
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:37 PM
Creation date
10/4/2006 6:40:05 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2002
Description
Flood Section - Floodplain Designations and Approvals
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB project manager, Mr. Brian Hyde. It is our belief that all comments and concerns regarding the <br />hydrology study have been taken into consideration at this time. <br />Staff findings: CWCB staff has determined that the subject 100-year hydrology information for the <br />Southwest Drainage basin in Otis is in conformance with the CWCB's rules and regulations for <br />floodplain designation and approval. The 100-year peak flood flows are reasonable and appear to <br />accurately describe flooding sources in the studied watershed. The most current regulatory floodplain <br />mapping published for the Southwest basin in Otis was studied by detailed methods, but did not take into <br />consideration important physical features in the watershed that effect the hydrology. CWCB staff finds <br />that the old detailed hydrology should be replaced with :the new detailed hydrology contained in the <br />October 2001 hydrology report presented here for designation and approval. <br />Staff recommendation: Staff recommends that the Board: l) designate and approve the 100-year <br />detailed hydrology information contained in said report within the Town of Otis and adjacent portions of <br />W!lShington County, and 2) authorize staff to prepare a floodplain resolution to be signed by the Director <br />and transmitted to the Town of Otis, Washington County, and l'EMA. This action is recommended in <br />order to meet statutory requirements. <br /> <br />STAFF RECOMMENDATION SUMMARY <br />Resolution Number 01-556: Flood Insurance Study for Eagle County <br />Staff recommends that the Board: 1) designate and approve the 100-year detailed and approximate <br />floodplain information contained in said report within nnincorporated portions of Eagle County, and 2) <br />authorize staff to prepare a floodplain resolution to be signed by the Director and transmitted to Eagle <br />County and FEMA. This action is recommended in order to meet statutory requirements. <br /> <br />Resolution Number 01-557: Flood Insurance Study for Gunnison County <br />Staff recommends that the Board: 1) designate and approve the 100-year detailed and approximate <br />floodplain information contained in said report within unincorporated Gunnison County, and 2) authorize <br />staff to prepare a floodplain resolution to be signed by the Director and transmitted to Gunnison County <br />and FEMA. This action is recommended in order to meet statutory requirements. <br /> <br />Resolution Number 01-558: Flood Hazard Area Delineation for Plum Creek in Douglas County <br />Staff recommends that the Board: 1) designate and appro"e the 1 OO~year detailed floodplain information <br />contained in said report within unincorporated Douglas! County, and 2) authorize staff to prepare a <br />floodplain resolution to be signed by the Director and transmitted to Douglas County, the Urban Drainage <br />and Flood Control District and FEMA. This action is recommended in order to meet statutory <br />requirements. <br /> <br />Resolution Number 01-559: Hydrology Reportfor Town of Otis <br />Staff recommends that the Board: l) designate and approve the 100-year detailed hydrology information <br />contained in said report within the Town of Otis and adjacent portions of Washington County, and 2) <br />authorize staff to prepare a floodplain resolution to be signed by the Director and transmitted to the Town <br />of Otis, Washington County, and FEMA. This action is recommended in order to meet statutory <br />requirements. <br /> <br />Flood Protection. Water Project Planning and FinanGing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.