Laserfiche WebLink
<br />-f<. <br /> <br />- <br /> <br />January 27-28,1999 <br />Agenda Item <br />Page 3 of 3 <br /> <br />. <br /> <br />TABLE 2 <br />LIST OF SCREENING MATRIX CA TEGOROIES <br /> <br />1) ALTERNATIVE NUMBER <br />2) ALTERNATIVE <br />3) ALTERNATIVE DESCRIPTION <br />4) SOURCEOFWATER <br />5) TOTAL VOLUME OF WATER MADE AVAILABLE <br />6) ABILITY TO ENHANCE 7-10 DAY PEAK <br />7) FREQUENCY OF WATER A V AILABILITY <br />8) CARRYOVER ABILITY <br />9) CAPITAL COST/AF <br />10) ANNUAL 0 & M COSTS/ AF <br />11) EFFECTS ON OTHER PROJECTS YIELD <br />12) WATER RIGHTS CONSIDERATIONS <br />13) ADMINISTRA nON CONSIDERA nONS <br />14) LEGAL CONSIDERATIONS <br />15) INSTITUTIONAL CONSIDERATIONS <br />16) CHANNEL CONSTRAINTS <br />17) PERMITTING (FEDERAL, STATE & LOCAL) <br />18) TIME REQUIRED TO IMPLEMENT <br />19) REQUIRED PHASE II INVESTIGATION REQUIRED <br /> <br />. <br /> <br />L: boardmemo/m ar99/21 n Mar99coordfac.doc <br /> <br />. <br /> <br />3 <br />