Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />COL LEGISLATIVE COUNCIL 1 I I <br />FISCAL NOTE WORKSHEET - EXPENDITURES Iii I <br /> <br /> <br />-~! <br /> <br /> <br />data for this model. In order to accomplish this task additional staff will be used to: 1) collect and interpret more accurate pumpage data from the Den <br />Basin aquifers; 2) collect and analyze aquifer.test data to better define the transissivity of the Denver Basin aquifers; 3) collect and analyze core <br />samples to better define transmissivity and specific yield of the Denver Basin aquifers; and 4) continue to expand the ground water level measuring <br />program in the Denver Basin. I I I i I <br />The staff activities will initially be focused on data collection, interpretation, analysis for model improvement and the development of rules for the timely <br />collection of accurate data and infonnation. Upon completion of the Rules a portion of the staffs activities will shift toward enforcement of the Rules. <br />Much of the staff will continue collection, verification, evaluation, analysis and model improvement. The PE III position activities will migrate from <br />Rule development to enforcement of the Rules along with continued oversight of field activities and coordination of data collection, analysis and evalua <br />They will also continue model improvements, development of alluvial and surface relationship associated with groundwater pumping depletion and <br />surface drainage influence, integration of refined technical parameters. data and code compatibility with other existing relational databases and model <br />including compatibility with future Decision Support Systems. Additional AG staff time may be needed starting in year 3, depending upon the amount <br />of resistance to the Rules encountered, I <br />STATUTORY CITATION 137-90-137.7 I <br />S~on3. ! <br />Denver basin aquifer ground water model - Colorado Water Conservation Board - State Engineer - rules i <br />i <br />I <br /> <br />BASE RESOURCES <br /> <br />FY 1998.99 <br />, <br />AODrooriation <br /> <br />1 <br />0.0 1 <br />001 <br />0.0 I <br /> <br />o <br />o <br />o <br /> <br />GF <br />CFI <br />TOTAL <br /> <br />0.0 I <br />0.0 <br />0.0 <br /> <br />01 <br />01 <br />o <br /> <br />ASSUMPTIONS <br />Additional staff are necessary to perform the above tasks: <br />One Professional Engineer III <br />One Physical Science Research/Scientist III <br />Three Engineer Physical Science Technician II <br /> <br />I <br />1 <br />I <br />I <br />I <br />, <br /> <br />CALCULATIONS <br />Position. Step Salary PERA <br />Professional Engineer 111-4 c.qa..,s-fl. 6,388.00 728.00 <br />Phy Sci Res/Scientist 111- 4 C;=:Jl! 5,371.00 618.00 <br />Eng/Phys SciTech 11-4 1~'i1:;P-. 3,141.00 361.00 <br />1. Two Professional Engineer Ills at $88,879 per year each. <br />2. One Physical Science Research/Scientist III at $75.145 per year each. <br />3. Three Engineer Physical Science Technician II at $44,864 per year each. <br />4. First Year Capital Expense per FTE <br />One Chair JV model CH-2004A <br />One Desk JV model DP-7236 <br />One Bookcase JV model BC-4803 <br />One Worktable JV model WT -6034 <br />One Office chair JV model SCU-001 <br />One Computer and Networking <br />Five Partitions I <br />Total Capital 1 <br />5. Annual Operating per FTE <br />6. One Leased Vehicle I <br />7. Lease space I I <br />l":::U sq. 11 per t" I t:. x 0 t"l E x ~ 1~.OO per sq. ft. I 8,400.00 <br /> <br />FY 1999-2000 <br />Medicare <br />106.00 <br />89.00 <br />53.00 <br /> <br />Total <br />7,406.29 <br />6,262.29 <br />3,739.29 1 <br />I <br />! <br /> <br />FY 2000-2001 <br />Annual Costs <br />88,875 <br />75,147 <br />44,871 <br /> <br />H/D/L <br />184.29 <br />184.29 <br />184.29 <br /> <br />199.00 <br />575.00 <br />230.00 <br />282.00 <br />66.00 <br />2,900.00 <br />625.00 1 <br />4,877.00 I <br />2,923.00 <br />4,464.00 <br /> <br /> 1 <br />1 , <br />I I <br /> 1 I <br /> I I <br /> i 1 - <br /> 1 <br /> 1 <br />350,479 501 342,079 <br />0 I 0 <br /> I ! <br />01 i 0 <br />350,479 1 5.0 I 342.079 <br /> , <br /> I I <br /> i i <br />1,867.479 I 5.0 i 342,079- <br />01 0.0 ' -' - '0 <br />- -. . <br /> " ~. -.. <br /> <br /> GF 5.0 . <br /> CF <br /> I 1 CFEI I <br /> I FFI I <br /> TOTAL I 5.0 i <br />. 1 I <br />I ! <br />TOTAL EXPENDITURE IMPACT GFI 5.0 <br />:T7T/ 9 8 I i CF, 0.0 <br />"0 ~., <br />