Laserfiche WebLink
<br /> <br />Frenchman Creek Feasibility Study: $25,000 <br /> <br />The City of Holyoke and Phillips County experienced flooding in 1997 when Frenchman Creek and <br />its tributaries overflowed. Funding will help pay for ~ flood mitigation planning and engineering <br />study to utilize recommendations provided by the Army Corps of Engineers so project design and <br />implementation can take place. The City of Holyoke IInd Phillips County are providing cash and/or <br />in-kind services. <br /> <br />Dry Creek Mitigation Feasibility Study: $50,000 <br /> <br />Larimer County, in cooperation with the City of Fort :Collins, has been working on a flood control <br />plan for Dry Creek. The plan would reduce flood risks, address stonn drainage problems, and address <br />irrigation system issues. Implementation ofthe plan ~quires a capital investment of approximately <br />$5.3 million, with an expected request for a loan n the amount of$3.9 million. A feasibility study <br />needs to be produced before a loan can be considered. <br /> <br />Arkansas River Well Measurement Program: $50;000 <br /> <br />Funding would help complete the second phase of a cooperative study of the power conversion <br />coefficient (PCC) method to measure groundwater-p1)mping volumes, This infonnation will be <br />valuable in the Kansas litigation and will also have other benefits because the PCC method is used to <br />detennine groundwater pumping volumes throughou( the U.S. The funds will be provided to the <br />State Engineer as needed for non. federal cost-sharing with the USGS. <br /> <br />Emergency Infrastructure Repair Loan Account: ~1.6 milllon <br /> <br />Twelve projects totaling more than $4 million have been financed through this account. The account <br />has proven to be an effective tool to respond to water supply related emergencies over the last seven <br />years. $1,6 million needs to be transferred from the Construction Fund's unreserved cash to bring the <br />balance in the account back to $2 million. <br /> <br />Foreclosure Account: $100,000 <br /> <br />The Board has a policy regarding delinquent loan collection. The Board's final course of action is to <br />refer the bad debt to the Attorney General's Office tei take appropriate legal action (including <br />foreclosure). A special fund within the Construction Fund would be established to provide the <br />financial resources and spending authority to cover tile costs associated with foreclosure proceedings. <br /> <br />Colorado River Recovery Program Loan Accoun~: $5 million <br /> <br />The account was established to make loans to power :Users of the federal Colorado River Storage <br />Project so help finance their participation in the recovery of four endangered fish species. The <br />balance in the aecount is currently $12 million. The eWCS's goal, when the account was created, <br />was to have $17 million available for loans. This funding would be the final installment. <br /> <br />For more infonnation about this or other water resoUj'ce topics you can contact the CWCB at: <br />1313 Shennan Street, Room/nl, Denver, CO, 80203 <br />Phone: (303) 866 3441. F,AX: (303) 866-4474. <br />htternet: www.cwcb.state.co.us. <br />i <br /> <br />i4 <br /> <br />: <br /> <br />1 <br />-:r <br />, <br />...' <br /> <br />- <br />.. ~ ~ <br /> <br />. <br /> <br />. <br /> <br />. <br />