My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00468
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:50 PM
Creation date
10/4/2006 6:39:02 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/28/2003
Description
CF Section - Mildred L. Rothe
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />" <br />i <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Rod Kuharich <br />eWeB Director <br /> <br />FROM: <br /> <br />John Van Sciver, P,E. -.::JvVV <br />Mike Serlet, P.E., Chief '-;i// f' <br />Water Supply Planning an~~e Section. <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: July 16, 2003 <br /> <br />SUBJECT: Agenda Item 21 h., July 28-30,2003 Board Meeting <br />Mildred L. Rothe <br /> <br />Introduction <br />Mildred Rothe is applying for a $353.482 loan to construct the Rothe Augmentation Plan, <br />consisting of 3 recharge wells, 2 augmentation wells, 3 separate pipelines, and 33 recharge sites. <br />The estimated total cost of the project is $392,758. Please see the attached project summary and <br />map, <br /> <br />Backaround <br />The Rothe Farm, located in Morgan and Weld Counties, consists of over 9000 acres. Irrigation <br />water is supplied by direct flow water rights, and by irrigation wells. <br /> <br />There are 17 junior wells on the Rothe Farm. The depletions from the pumping of these wells <br />must be replaced during times when there is a "call" on the river by a senior downstream water <br />right. GASP has successfully been used for the past 30 years to cover the depletions on these <br />wells. However, GASP operates on a year-to-year basis with no guarantee of continued <br />coverage, The current drought has brought to the foreground just how difficult it is to provide <br />adequate augmentation for well users. GASP has even indicated to its members that if the <br />drought continues, well pumping may be curtailed, <br /> <br />The Rothe Farm wants to construct a recharge system (the Rothe Augmentation Plan) to <br />generate augmentation water to be used to offset the depletions caused by 17 wells serving <br />3055 irrigated acres, By generating its own augmentation credits, the Farm can protect itself <br />from pOSSible curtailment and help GASP strengthen its coverage in the same area of the river. <br /> <br />Feasibility Studies <br />Brent Nation, P.E. of Nation Engineering Services, has completed the feasibility study. The report <br />includes an evaluation of alternatives available to generate an augmentation supply for the Rothe <br />Farm wells, <br />
The URL can be used to link to this page
Your browser does not support the video tag.