My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00464
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:49 PM
Creation date
10/4/2006 6:39:01 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Platte River Basin Issues - USGS Infrastructure Resources Project Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Colorado Water Conservation Board <br />, Department of Natural Resources <br />721 Centennial Building <br />1 31 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />fAX: (3031 866.4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br /> <br />I~mes S. lochhend <br />Executive Oirecror, DNR <br /> <br />DMiesC.li!e, P.E. <br />Director, eWeB <br /> <br />TO: <br /> <br />Colorado Water conserva~~ Members <br /> <br />William P. Stanton, P,E. . . <br />Chief, Project Planning and Construction Section <br /> <br />FROM: <br /> <br />DATE: <br /> <br />November 9, 1998 <br /> <br />SUBJECT: <br /> <br />Agenda Item 15f, November 23-24, 1998, Board Meeting - <br />Platte River Basin Issnes <br />USGS Infrastructure Resources Project Status Report <br /> <br />. The CWCB and the Division of Water Resources are co-sponsoring a study of the <br />"Hydrogeologic Characteristics of the Shallow Aquifers of the Boulder-Fort Collins-Geeley- <br />Brighton Area of the Colorado Front Range," The study was initiated in 1996 and is part of the <br />U,S, Geological Survey Infrastructure Resources Project. In November 1996, the Board agreed <br />to contribute $30,000 from Severance Tax Operational Account moneys allocated to the CWCB <br />for FY 97 and FY 98 towards the study (Contract Number C-153766). <br /> <br />The fust 2 years of the 3-year project are now complete, and the project is on time and within <br />budget. Two publications have been produced so far as part of the Infrastructure Project in <br />partial fulfillment of the reporting requirements of the joint funding agreement. These <br />publications are entitled: <br /> <br />· S.G. Robson and 1.S, Heiny, "Front Range Infrastructure Resources Project, Water Resources <br />Activities," USGS Fact Sheet 113-98,4 pages, October 1998, <br /> <br />· S.G. Robson, George Van Slyke, and Glenn Graham, "Structure, Outcrop, and Subcrop ofthe <br />Bedrock Aquifers along the Western Margin of the Denver Basin, Colorado," Hydrologic <br />Investigations Atlas HA-742, 5 sheets, 1998, <br /> <br />.. <br /> <br />A copy of the Fact Sheet is attached to this memo, and a set ofthe maps will be available for <br />inspection at the Board meeting, <br /> <br />Attachment <br /> <br />L:\BOARDMEM\NOV98\15f - USGS,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.