Laserfiche WebLink
<br />- 3 - <br /> <br />8. Stream and Lake Protection-Injury with Mitigation-Case No. 5-03CW331; Application of Table Rock <br />Properties, LLCn Pursuant to ISF Rule 8i.(3), the Board will be asked to conduct a preliminary review of <br />the proposed pre-trial resolution to determine whether the natural environment could be preserved to a <br />reasonable degree with the proposed injury or interference if applicant provided mitigation. This is the first <br />of two required meetings for the Board to approve an Injury with Mitigation proposal.) (II :20 -11:40) <br /> <br />9. Stream and Lake Protection Section-Proposed Cunningham Creek Flow Reduction-The Colorado <br />Division of Wildlife will make a presentation to the Board on its efforts to protect and restore the <br />Cunningham Creek population of genetically pure Colorado River Cutthroat Trout by eradicating non- <br />native fish in that creek. and will ask the Board to consent to a temporary flow reduction below the Board's <br />decreed ISF amount as a means to achieve those goals. (11:40 - 12:00) <br /> <br />Ill. Stream and Lal,e Proteetioa Section Pre trial Resolution Case No.3 1l1CWOH, San Lui~ Valley <br />Water Con~er':ancy Di~trict Staff",m ask the B8IlM Is rc-He", a [H'fJp9Sed p,e tl'iall'l!solution B-fthis <br />applieation Is add new augmentatioN ",ate, t6 an a:isting plan to: augmentation. (Ulllll 12:lS) <br /> <br />LUNCH 12:15 - 1:15 <br /> <br />11. Stream and Lal,e Protection Section Renewaloftke MOJ. hetwcen t-lle Eagle m'/er Water & <br />Sanitation District and the Colorado Dcpartment of Natural Re~oHFees The Eagle m'/er Water & <br />Sanitation Distriet (Distriet) will mal,e a presentation coneerning thc proposed second enlargement <br />of the Blael, Lal,e No.1 and operational changes to pro\'ide additional water fer the District needs <br />ineluding augmentation of strcamt10ws iu Core Creel, and the Eagle River. Staff re'luests that the <br />Board approve the attaehed MOU hetween the District aud DNR. (1: Hi 1: 115) <br /> <br />12. Water Conservation and Drought Planning - HB 1365 Guidelines; Water Conservation Planning and Grant <br />Application; Model Conservation Plan (I :45 - 2:25) <br /> <br />13. Water Supply Planning and Finance Section and Water Supply Protection Section - Feasibility Study <br />Status Report (2:25 - 2:45) <br />a. La Plata Water Conservancy District - Long Hollow and Red Mesa Ward Reservoirs <br /> <br />14. Water Supply Planning and Finance - Construction Fund and Severance Tax Trust Fund Perpetual Base <br />Account New Loans (2:45 - 3: IS) <br />a. Lower Sacramento Creek Reservoir Co. - Reservoir Rehabilitation Project <br /> <br />IS. Water Supply Planning and Finance Section - Changes to Existing Loans (3: IS - 3:30) <br />a. Guenzi Farms, Inc. - Groundwater Recharge Project & Water Rights Purchase <br /> <br />BREAK 3:30 - 3:45 <br /> <br />16. Water Supply Planning and Finance Section - General Matters (3:45 - 4:05) <br />a. Review Colorado Water Resource & Power Development Authority Memorandum of Understanding <br /> <br />17. Water Supply Planning and Finance Section - Request for Funds from the Small Project Feasibility Study <br />Grant Fund (4:05 - 4:25) <br />a. Orchard Mesa Irrigation District <br /> <br />18. FY 06-07 Severance Tax Operational Account Recommendations (4:25 - 4:45) <br /> <br />ADJOURN FOR TUESDAY, MARCH 22, 2005. <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />