Laserfiche WebLink
<br />e 16. Review of SB 87 <br />17. Construction Fund . Status of Projects <br /> 18. Floodplain Management Resolutions <br /> a. Flood Insurance Study, City of Broomfield, Colorado, revised August 16, 1988; <br /> Floodplain Resolution No. 92-314 <br /> b. Flood Insurance Study, City of Broomfield, Colorado, revised September 28, <br /> 1990; Floodplain Resolution No. 92.315 <br /> c. Major Drainageway Planning, Lower Ralston/Van Bibber and Leyden Creeks, <br /> Phase B Report, dated February 1986 (City of Arvada and Jefferson County); <br /> Floodplain Resolution No. 92-320 <br /> d. Flood Insurance Study, Town of Windsor, Colorado, dated September 27, <br /> 1991; Floodplain Resolution No. 92.321 <br /> e. Letter from CWCB to local governments notifying them of undesignated <br /> floodplain studies and of the need to have them designated by the CWCB <br />e f. Sanchez Reservoir. request for Corps' emergency funds, <br /> 19. Directors Reports <br /> a. CWR&PDA <br /> b, State Engineer <br /> c. Director, CWCB <br /> d, Other Directors <br /> 20. Instream Flow Program: Piedra Wilderness <br /> a. Status of S. 1029 <br /> b. Status of Wilderness Water Requirements Determinations <br /> 21. Instream Flow Program: Rules and Regulations <br /> [Lunch. Matters in litigation. executive session] <br />. 3 <br />