Laserfiche WebLink
<br />.... . <br /> <br /> COST CHANGES IN PROJECT FROM ESTIMATE TO ACTUAL <br />VENDOR DISCRIPTION QUANllY PRICE ESTIMAT QUANlY PRICE ACTUAL OVER UNDER <br />SARGENT NEW RECHARGE WELL DRILLING 0 0 0 10 240' 67413.94 <br />BETTER ELE NEW RECHARGE WELL MOTOR 200 0 12000 <br />SARGENT TOTAL COST NEW RECHARGE WELL 1 46000 79413.94 -33413.94 <br />SARGENT REFERBISH OLD RECHARGE WELL 0 7338 7338 <br />SARGENT 75 HORSE ELECT MOTOR OLD RECH 0 0 0 1 3950 3950 <br />SARGENT TOTAL COST OLD RECHARGE WELL 10000 11288 -1288 <br />BETTER ELE INSTALL PANELS FOR 200HP WELL 0 6169.46 <br />BETTER ELE INSTALL PANELS FOR SHORT SETS 0 6058.94 <br />BETTER ELE INSTALL PANEL FOR OLD RECHAR 0 1918.92 <br />BETTER ELE PUMP PANELS FOR SHORT SETS 0 1780.5 <br />BETTER ELE PUMP PANEL FOR 75 HP MOTOR 0 1430.8 <br />BETTER ELE PUMP PANEL FOR NEW WELL 0 6529,27 <br />BETTER ELE TOTAL ALL ELECTRICAL PANELS 9000 9000 23887,89 -14887.89 <br />L GRAUBER BUILD CHECK-WATER DIVERSION 3096.05 -3096.05 <br />L GRAUBER WORK TO CROSS HWY 8 CULVERTS 202,69 -202.69 <br />B. WINEMILL PLACE MANURE IN IRR POND 270 -270 <br />CIRCLE L 2O"x 30" SURGE TANK 250 250 <br />CIRCLE L 21. CHECK VALVE 1200 1200 <br />CIRCLE L 10" FLOW METERS 3 759,89 2279.67 2278.67 <br />CIRCLE L 10" FLOW METER FOR AUG WELL 1 759.89 759.89 759.89 <br />CIRCLE L 120" 21' PVC FOR CROSSING ROAD 120' 16,9 2028 2028 <br />CIRCLE L 12"-112 STEEL 112 PVC FOR PIVOT 2 1 400 1 400 0 <br />CIRCLE L 10" DOGLEG FOR PIVOT 2 1 280 280 280 <br /> TOTAL PAGE 2 -52398.88 6038.67 <br /> TOTALS PAGE 1 -31582 18501 <br /> TOTAl -83980.88 22=.67 <br /> 22583 <br /> TOTAL OVERUN COST FOR PROJECT -61397.68 <br /> <br />. <br /> <br />. <br /> <br />. <br />