My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00457
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:25 PM
Creation date
10/4/2006 6:38:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/22/2005
Description
CF Section - Changes to Existing Loans Guenzi Farms Incorporated, Well Augmentation/Recharge Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, , <br /> <br />--. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br /> <br />Memorandum <br /> <br />Bill Owens <br />Governor <br /> <br />Russell George <br />Executive Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board M m ers <br /> <br />FROM: <br /> <br /> <br />Rod Kuharich <br />eweB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: <br /> <br /> <br />SUBJECT: Agenda Item No. 15, March 22-23, 2005, Board Meeting <br />Water Supply Planning and Finance - Changes to Existing Loans <br />Guenzi Farms Incorporated, Well AugmentationlRecharge Project <br /> <br />INTRODUCTION <br />Guenzi Farms Incorporated is requesting an increase of$17 ,261 to their May 2004 authorization <br />of $334,739 for the Guenzi Augmentation Plan, The requested loan increase is due to cost <br />overruns incurred during construction of the project. <br /> <br />BACKGROUND <br />At the May 2004 board meeting, the Colorado Water Conservation Board approved a loan to <br />Guenzi Farms in the amount of$334, 739, from the Severance Tax Trust Fund, The $334,739 loan <br />authorization was for the construction of the Guenzi Augmentation Plan, consisting of 2 recharge <br />wells, 5 recharge sites, and 6,700 linear feet of 12 - 21 inch PVC Pipe, <br /> <br />The Guenzi Farm is located in Logan County, approximately 5 miles southwest of the City of <br />Sterling, The Guenzi's currently irrigate approximately 2,600 acres by a combination of flooding <br />and sprinkling. A majority of the irrigation is accomplished by the operation 001 tributary <br />groundwater wells, These current operating wells generate 1,510 acre-feet of summer-time <br />depletions and 960 acre-feet of wintertime depletions, which are currently augmented by the Logan <br />Well Users, These wells that the Guenzi's own have what is considered a very junior water right. <br />There are numerous downstream ditches, a reservoir, and the Interstate Compact with Nebraska, <br />which all hav~ senior water rights to the Guenzi's wells, Construction of the Guenzi Augmentation <br />Plan will cover their annual depletions and eliminate their $45,000 annual payment to the Logan <br />Well Users, <br />
The URL can be used to link to this page
Your browser does not support the video tag.