My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00416
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:52 PM
Creation date
10/4/2006 6:37:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/2003
Description
CF Section - Consultant Recommendations for the Statewide Water Supply Initiative and the Colorado River Return Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />MEMORANDUM <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Mike Serlet, P.E., Chief, .R1IJ <br />Water Supply Planning ~~;'ance Section <br /> <br />FROM: <br /> <br />DATE: <br /> <br />January 10, 2003 <br /> <br />SUBJECT: Agenda Item 18 - January 22-23, 2003, Board Meeting <br />Water Supply Planning and Finance <br />Consultant Recommendations for the Statewide Water Supply Initiative and the <br />Colorado River Return Project <br /> <br />On Tuesday, January 21, 2003 the consultant selection committee for the Statewide Water <br />Supply Initiative (SWSI) and the Colorado River Return Project (CRRP) will interview six <br />consulting firms, three for each study, interested in providing professional services towards the <br />completion of each 8tudy. The committee will report at the Board meeting the results of the <br />interviews and recommend the preferred consultant for staff to commence contract negotiations <br />with. For the Board's information only, prior to the meeting, the executive sUlllffiaries from each <br />consultant prop08al are attached. <br /> <br />The staff will solicit guidance from the Board regarding the consultant contract negotiations <br />relative to cost, final scope of work, and selection of technical review committees. <br /> <br />Staff will also discuss the assignment of the internal project manager for the administration <br />of each project. It is staffs intention to provide study progress reports at each Board meeting during <br />the term of each study. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.