Laserfiche WebLink
<br />Project Name <br /> <br />Authority <br /> <br />Phase <br /> <br />Sponsor <br /> <br />Representative <br /> <br />FY 03 Budget <br />Request <br /> <br />FY 04 Budget Request <br /> <br />Section 1135 Project Modifications to Improve the Environment-Cost Share 75% Federal; 25% non~Federal <br />Cherry Creek Reservoir, CO Continuing Authorities Project Restoration Plan. Chery Creek Basin Diane DeGette (1); $0 <br />Program; Section 1135, Submit PRP to NWO for Water Quality Thomas Tancredo (6); <br />Project Modifications to approval Apr 2003. Authority and Robert Beauprez (7) <br />Improve the Environment Sponsor will most likely <br />proceed without COE <br />involvement. <br /> <br />Prowers County, CO <br /> <br />Littleton, Chatfield Downstream, <br />South Platte River, CO <br /> <br />Denver. Upper Central Platte <br />VaHey (Colfax Reach), CO <br /> <br />Total Funding <br /> <br />Continuing Authorities <br />Program; Section 1135, <br />Project Modifications to <br />Improve the Environment <br /> <br />Continuing Authorities <br />Program; Section 1135, <br />Project Modifications to <br />Improve the Environment <br /> <br />Continuing Authorities <br />Program; Section 1135, <br />Project Modifications to <br />Improve the Environment <br /> <br />Project Restoration Plan. Prowers County <br />Complete PRP and <br />submit to SPD for <br />approval Apr 2003; <br />initiate Planning and <br />Design Analysis Apr <br />2003; complete PDA June <br />2003; Construction award <br />Nov 2003 <br /> <br />Project Design Analysis. Colorado Water <br />Project Restoration Plan Conservation Board <br />approved by NWD <br />January 2003. Before <br />proceeding with the <br />feasibility study, NWO is <br />to complete hydrologic <br />and hydraulic analyses to <br />determine the capacity of <br />the floodway to carry <br />design flows and the <br />current level of flood <br />protection afforded by the <br />existing flood control <br />project. Upon completion, <br />NWO to recommend <br />proceeding with Dr <br />terminating the study. <br /> <br />Construction. Complete <br />construction Apr 2004 <br />(physical construction is <br />complete; contractor is <br />monitoring vegetation <br />growth). Turn over <br />project to sponsor Apr <br />2004. <br /> <br />Marilyn Musgrave (4) <br /> <br />Thomas Tancredo (6) <br /> <br />Greenway Foundation Diane DeGette (1) <br /> <br />$0 <br /> <br />$100,000 <br /> <br />$300,000 <br /> <br />$55,000 (Potential to add To be determined <br />$100,000 to complete <br />the PDA and revise the <br />Operation and <br />Maintenance Manual, <br />pending the outcome of <br />the hydrology and <br />hydraulics study). <br /> <br />$0 <br /> <br />$0 <br /> <br />$155,000 <br /> <br />$300,000 <br /> <br />Estimated Project Corps <br />Cost District <br /> <br />To be determined <br /> <br />$600,000 <br /> <br />To be determined <br /> <br />$5.0 million <br /> <br />Omaha <br /> <br />Albuquerque <br /> <br />Omaha <br /> <br />Omaha <br />