My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00396
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:49 PM
Creation date
10/4/2006 6:37:46 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/24/2003
Description
Flood Section - Corps of Engineers Programs and Status Update
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />U.S. ARMY CORPS OF ENGINEERS FY 03 - 04 BUDGET SUMMARY (COLORADO CIVIL WORKS PROGRAM) <br /> <br />Project Name Authority Phase Sponsor Representative FY 03 Budget FY 04 Budget Request Estimated Project Corps <br /> <br />Request Cost District <br /> <br />Construction General Funding; Continuing Authorities Program (CAP) Note that CAP Projects are not listed as individual line items in the President's budget <br /> <br />Section 14 Emergency Streambank Protection-Cost Share 65% Federal; 35% Ron~Federal (minimum non-Federal cash contribution of 5% required) <br /> <br />Glenwood Springs, 27th Street Continuing Authorities Planning and Design City of Glenwood Scott McInnis (3) $150,000 $245,000 $648,000 Albuquerque <br />Bridge over the Roaring Fork River Program; Section 14, Analysis (POA) to be Springs <br />Emergency Streambank completed March 2003; <br />Protection construction to start <br />September 2003 <br /> <br />Colorado Springs, east fork of <br />Sand Creek at Powers Boulevard <br /> <br />Colorado Springs, Sand Creek at <br />Chenon Road <br /> <br />Total Funding <br /> <br />Continuing Authorities <br />Program; Section 14, <br />Emergency Streambank <br />Protection <br /> <br />$285,000 <br /> <br />Albuquerque <br /> <br />$250,000 <br /> <br />$895,000 <br /> <br />Planning and Design <br />Analysis (PDA) <br /> <br />City of Colorado <br />Springs <br /> <br />Joel Hefley (5) <br /> <br />Continuing Authorities <br />Program; Section 14, <br />Emergency Streambank <br />Protection <br /> <br />Planning and Design <br />Analysis (PDA) <br /> <br />City of Colorado <br />Springs <br /> <br />$40,000 <br /> <br />$0; project halted at sponsor $975,000 <br />request <br /> <br />Albuquerque <br /> <br />Joel Hefley (5) <br /> <br />$475,000 <br /> <br />$495,000 <br /> <br />Section 205 Flood Damage Protection-Feasibility Study Cost Share 50% Federal; 50% non-Federal; Plans & Specifications and Construction cost share 650/0 Federal; 35% non-Federal <br /> <br />Creede, CO, Willow Creek Continuing Authorities Feasibility Town of Creede Scott Mcinnis (3) $0; $32,000 Federal $0 $2.6 million Albuquerque <br />Program; Section 205 funds expended through <br />Flood Damage Protection FY 02 <br /> <br />Colorado Springs, Cheyenne <br />Creek <br /> <br />Florence, Oak Creek <br /> <br />Van Bibber Creek, Arvada, <br />Jefferson County, CO <br /> <br />Total Funding <br /> <br />Continuing Authorities <br />Program, Section 205, <br />Flood Control <br /> <br />Feasibility <br /> <br />$8,000 <br /> <br />$0; awaiting hydrology and <br />hydraulic information from the <br />Fountain Creek GI study <br /> <br />Albuquerque <br /> <br />City of Colorado <br />Springs <br /> <br />Joel Hefley (5) <br /> <br />To be detennined; <br />project cost may <br />exceed Federal <br />funding limits for <br />Section 205 project <br />($7.0 million). <br />$9.2 million <br /> <br />Albuquerque <br /> <br />Continuing Authorities <br />Program; Section 205 <br />Flood Damage Protection <br /> <br />$127,000 <br /> <br />$155,000 <br /> <br />Feasibility <br /> <br />City of Florence <br /> <br />Joel Hefley (5) <br /> <br />Continuing Authorities <br />Progrom; Section 205 <br />Flood Damage Protection <br /> <br />$803,000 ($53,OOO for <br />P&S; $750,000 for <br />construction) <br /> <br />Omaha <br /> <br />$4.0 million <br /> <br />$13.3 million <br /> <br />Plans and Specifications; <br />construction award June <br />2003 <br /> <br />City of Al"1ada <br /> <br />Robert Beauprez (7) <br /> <br />$938,000 <br /> <br />$4.2 million <br />
The URL can be used to link to this page
Your browser does not support the video tag.