My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00385
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:45 PM
Creation date
10/4/2006 6:37:41 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/28/2003
Description
CF Section - New Loans - Town of New Castle- Clolorado River Raw Water Transmission
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Town of New Castle - Colorado River Diversion <br />July 28-29, 2003 <br /> <br />Agenda Item 21f <br /> <br />13,490 acres and has damaged a considerable portion of the East Elk Creek watershed. Significant <br />water quality problems, and damage associated with sediment and ash-laden runoff, are anticipated <br />during periods of heavy rain and snowmelt runoff. <br /> <br />The Town's existing water supply facilities consist of a diversion structure on East Elk Creek that <br />supplies water to adjacent sedimentation pond. From the pond, water is supplied to the Town's <br />water treatment plant located in Elk Creek Subdivision. From the water plant, potable water is <br />supplied to the Town's distribution system consisting of a variety of pipes ranging in size from 16" <br />diameter down to 6" diameter. The distribution system also consists of two pump stations and three <br />water storage tanks. The tanks are 300,000 gallons,.1 ,000,000 gallons and 800,000 gallons in size. <br />The Town's current population is 2,268. The Town serves about 1001 domestic and commercial/ <br />industrial water taps, and has an average annual water use of about 400 acre-feet. <br /> <br />Feaslbilitv Studies <br /> <br />The Town, in conjunction with its engineer Schmueser Gordon Meyer of Glenwood Springs, has <br />completed a feasibility study In accordance with CWCB guidelines. The study includes an <br />assessment of alternatives available for increasing the reliability of the Town's raw water supply. <br /> <br />The Town of New Castle <br /> <br />The Town of New Castle is a local governmental public entity in Garfield County, situated <br />approximately 10 miles west of Glenwood Springs. It was incorporated in 1888. The Town's Utility <br />Fund (water and sewer) is operated as an enterprise fund. <br /> <br />Water Rlahts <br /> <br />Currently the Town's sole source of water supply is a water right on East Elk Creek for 2.67 cfs with <br />an appropriation date of 1889. The primary source of water for the new project is an absolute <br />water right of 3.0 cfs protected under the Green Mountain Reservoir Historic Users Pool off of the <br />Colorado River. In addition, the Town has a long term contract with the U.S. Bureau of <br />Reclamation for 400 acre-feet of water from Ruedi Reservoir, as a back-up for the new diversion. <br /> <br />Proiect DescrlDtlon <br /> <br />The purpose of this project is to mitigate the impacts of drought and wildfire on the Town of New <br />Castle's water supply. The main objective is to ensure that the town has a reliable water supply in both <br />quantity and quality. Four alternatives were considered to meet these objectives: <br /> <br />1. No action alternative. <br />2. East Eik Creek Mitigation - Construct sediment removal structures on East Elk Creek <br />upstream of the water treatment facility. Purchase senior water rights on Main Elk <br />Creek and/or change the point of diversion to minimize the risk of administrative <br />curtailment. <br />3. New Well Field - Develop a well field to provide an alternate source of water supply. <br />4. Colorado River Diversion - Develop an alternate source of water supply from the <br />Colorado River. <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />Alternative No.1, No action alternative: This alternative was deemed unacceptable due to the . <br />associated risk and severity of not addressing the impacts of wildfire and drought on the Town of <br />New Castle's water supply. . <br /> <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.