Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />/tl).,. .. <br /> <br />STATE OF COLOMDO <br /> <br />Q <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3441 <br />FAX: (3031866-4474 <br />www.cwcb.state.co.us <br /> <br />MEMORANDUM <br /> <br />To: <br /> <br />Colorado Water Conservation Board Members <br /> <br />From: <br /> <br />Dan Merriman <br />Ted Kowalski <br />Bahman Hatami <br /> <br />Date: <br /> <br />September 13,2001 <br /> <br />Subject: <br /> <br />Consent Agenda Item 2a, September 24-25, 2001, Board Meeting- <br />Stream and Lake Protection -Case Resolution <br />Case No. 1-94CW290 - Buffalo Park Development Co. et al. <br /> <br />Backl!round <br />The Board ratified the statement of opposition filed in Case No, 1-94CW290 at its March <br />13, 1995 meeting, Case No. 1-94CW290 is liUl application for surface water rights liUld <br />ground water rights, a change of water rights, conditional appropriative rights of <br />substitution and exchange, and a plan for augmentation on Cub Creek, Blue Creek, Bear <br />Creek, and North Turkey Creek near Evergreen (see attached map). In this application, the <br />Applicants (Buffalo Park, inc., Evergreen Memorial Park Inc" Colorado Mountain Park <br />Inc" North Fork Associates, Inc., and Mountain Mutual Reservoir Company (MMRC)) <br />propose to augment depletions with releases from certain on-site reservoirs that will be <br />constructed, consumptive use credits from the Harriman and Warrior Ditches, and from <br />storage in Soda Lakes, which are located on Bear Creek downstream from Evergreen Lake. <br /> <br />CWCB Appropriations <br />The Board has appropriated the following instream flow rights that may be affected by the <br />application in Case No. 1-94CW290: <br /> <br /> Case No. Stream Amount (cfs) Appropriation Date <br /> 1-94CW250 N, Turkey Creek 3 (4/15-10/15) 11/3/94 <br /> _75 (10/16-4/14) <br />. 1-94CW251 Cub Creek 2 (4/15-10/15) 11/3/94 <br /> .75 (10/16-4/14) <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and lake Protection <br />Water Supply Protection. Conservation Planning <br /> <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />b:ecutive Director <br />Rod Kuharich <br />ewes Director <br />Dan McAuliffe <br />Deputy Director <br />