My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00365
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:31 PM
Creation date
10/4/2006 6:37:24 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
ISF Section - Instream Flow Appropriations - South Fork Smith Fork
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Staff's Instream Flow Recommendation <br />Based on the CDOW recommendation, staff recommends the Board form its intent to appropriate <br />on the following stream reach: <br /> <br />Seqment: Headwaters to North Fork of the Smith Fork <br />Upper Terminus: Headwaters at <br />(Latitude 380 40' 20"N) (Longitude 107024' 30"W) <br />UTM = 42 83 145N 13 290 480E <br /> <br />Lower Terminus: North Fork of the Smith Fork <br />(Latitude 380 43' 31"N) (Longitude 107028' 23"W) <br />UTM = 42 89 187N 13 285 021E <br />NE NW S29 Tl5S R90W 6PM <br /> <br />Watershed: Upper Gunnison (HUC: 14020002) <br />Counties: Gunnison <br />Length: 5.9 miles <br />USGS Quad(s): Mt Guero <br />Flow Recommendation: 6.4 cfs (April 15 - July 31) <br />3.0 cfs (August I - November 14) <br />2.4 cfs (November 15 -March 14) <br />4.1 cfs (March 15 - April 14) <br /> <br />- 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.