My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00361
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:22 PM
Creation date
10/4/2006 6:36:41 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/1945
Description
Table of Contents and Minutes
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />..~ <br /> <br />PAGE <br />- <br /> <br />Wesley R. Nelson. Direotor Region 5. Bureau of <br />Reolamation reported on projeots in Rio Grande <br />Basin. inoluding Closed Basin Drain. San Luis <br />Valley Project and San Juan~Chama diversion. 254~255 <br />E. O. Larsoa. Direotor- Region 4. Bureau of Reclamation. <br />reported on projects in Colorado River Basin. <br />inoluding La Plat... Florida. Pine River Extension. <br />Paonla. Silt. 'Weat Divide. Collbran and Manoos. 255 <br />Disoussion of preservation and proteotien of fish and <br />wildlife in oonneotioZl with reols.mation project <br />development by C, N. Heut. Colorado Fish and <br />Game Commission and others. 255 <br />R. J. Tipton report OZl status of investigation of <br />Sump Drain projeot in San LuiSi Valley. 255-256 <br />E. B. Debler. Director Region 7. Bureau of <br />Recllllllation. reported on status of Blue~South Plat-te <br />and Gunnison-Arkansas diversion projeot in- <br />veatigations and that preliJaimry reports would be <br />made early part of 1946. 256 <br />Chief Engineer Patterson report of speoial committee on <br />comments of Colorado en flood oon1;rol plans ot CorP& <br />of .ArrIry Engineers for Upper South Platte River. 256. <br />Director Stone reported on meeting with Governor Hunt of <br />Wyoming en July 23. 1945 regarding initiation ot <br />compact negotiations between Upper Colorado River <br />Basin StateII'. _ resulted in delay until completion of <br />Comprehensive report on development of Colorado River <br />Basin by Bureau of Reclamation, 256-257 <br />Direotor stone reported an compact negotiation., with <br />Wyoming on Little Snake> Rive)!' Buin. 257 <br />MotioZl adopted recommending to Governor appointment of <br />George A. Pughe as; additional Colorado compact <br />GOmmluioner on Little Snake River. . 257 <br />Attorney Brei~enstein reported on status of North Platte <br />River case and form ef proposed decree tQ be sub- <br />mitted to Supreme Court. 257 <br />J. O. Riddell. Irrigation Engineer. P. W. D. of N_ <br />Zealand. explained irrigation problems in his <br />country. 258 <br />Chief Engineer Patterson pre.ented comments on pr~- <br />liminary report of Corps ot Army Engineer. for <br />comprehensive flood Gontrol development on Kansas <br />River. a58 <br />E. B. Debler. Bureau of Reclamation, GOllDllents oZl Army <br />report on Kansas River and status of Bureau report <br />on Republican River. 258 <br />Chief Engineer Patterson on Colorado's interest in <br />RepubliGan River development. 258 <br />Motion adopted regarding Colorado's Comm&ZltS. OZl Army <br />Engineers report on Republican River. 2;8R259 <br /> <br />. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.