Laserfiche WebLink
<br />IIMI\-'::O-"" 1'1\1 UO.O':: rn rUI'(LHf.. l:jKUWN1Nli ill JUHN:i. <br />. . <br /> <br />l' AX NU. .:lU.:l <br /> <br />p, 03/06 <br /> <br />. <br /> <br />13. Applicants' out-of-priority depletions may only exceed the monthly <br />historic limits set forth in subparagraph C below if said cxeeedanecs arc augmented from sources <br />at or above the point(s) of diversion. <br /> <br />C. !listode Depletion Credits (Average depletions in Acre Feet). <br /> <br />Month J.n Feb Mar Apr May June July Aug Sept OCI Nov Dee <br />CUllIulative 0.0 0.0 0.0 0.0 3M 57.6 57.3 53.5 31.7 16.9 0.0 0.0 <br />l)epletiolls (afJ <br /> <br />D. Whenever the Upper Eagle River ISF is not being satisfied immediately <br />downstream of one of Applicants' active diversion points Applicants shall make all diversions of <br />potable water at the Raw Water Booster Pump, subject to the exception in subparagraph (E) <br />below. Applieal1ts shall be entitled to make non-potable diversions and diversions into storage <br />wIlen the Upper Eagle River ISF is not being satisfied, so long as the above terms and conditions <br />arc satisfied. <br /> <br />. <br /> <br />E. Applicants shall always be entitled to divCl1 potable water at the Individual <br />Wells, even when the Upper Eagle River ISI' is not being satisfied, so long as the Individual <br />Wells use septic systems and resulting out-oF-priority depletions are replaced with historic <br />depletion credits or releases of upstream storage water. In the event that the Individual Wells are <br />110t connected to septic systems, Applicants shall always be entitled to divert at the Individual <br />Wells only if out-of-priority diversions are fully augmented with historic depletion credits or <br />upstream storage water. - <br /> <br />F. When the Upper Eagle River ISF is not being satisfied during the non- <br />irrigution season, Applicants shall ensure that effluent generatcd at the Avon Wastewater <br />Treatment Plant, and attributable to the Project, shall be delivered upstream to a point <br />approximately 70 feet downstream of the Raw Water Rooster Pump. <br /> <br />G. The Authority agrees to make some stream improvements in the reach <br />between the Raw Watcr Booster Pump and the point where effluent may be delivered upstream <br />pursuant to subparagraph (F), consisting of the movement andlor placement of rocks, to hclp <br />direct Eagle River flows tow,lrd the North b~nk oJ'the Eagle River during times oflow flows to <br />help mailltain a fish passage in this 70 foot reach. <br /> <br />. <br /> <br />H. The provisions sct forth above in sub-paragraphs (F) and (0) shall only be <br />r~quired when the following "lriggers" arc bOlh salisilied; (i) when the Project reaches 30% <br />build-out (as measured by single family equivalents); and (ii) when the average daily treated <br />water demand at the Avon Water Treatment Plant increases 0.35 c.f.s. above the base water <br />deIllalld during the period of October I through April 30. Said "base Voiater demand" shall be the <br />average daily treatcd water demand at the Avon Water Treatment Plant during the Octoher I <br />through April 30 period that precedes any build-out of the Project. Applicants shall be required <br /> <br />SIl0432 <br /> <br />-2- <br />