My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00336
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:06 PM
Creation date
10/4/2006 6:36:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/28/2003
Description
CF Section - New Loans - Windsor Reservoir & Canal Company - Storage Recovery Project for Windsor Reservoir No. 8 and No. 8 Annex
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Windsor Reservoir & Company <br />July 28-29 2003 <br /> <br />Agenda Item 21a <br /> <br />Water Project Construction LO,an Program-Project Data <br /> <br />Borrower: Windsor Reservoir & Cana,l Co. <br /> <br />County: Larimer <br /> <br />Project Name: Windsor Res. No. 8/Annex <br />Drainage Basin: South Platte <br /> <br />Project Type: Rehabilitation <br /> <br />Water Source: Cache La Poudre River <br /> <br />Total Project Cost: $750,000 <br /> <br />Funding Sources: CWCS, WRCC <br /> <br />Type of Borrower: Agricultural <br /> <br />AVer. Delivery: 620 acre-feet <br /> <br />CWCB Small Project Loan: $675,000 <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />The Windsor Reservoir & Canal Company (WRCC) is applying for a loan to recover 620 acre-feet of <br />storage in their Windsor Reservoir No. 8 and No. 8 Annex, by excavating and removing up to <br />1,000,000 cubic yards of-sediment. The WRCC serviCe area extends from their Cache la Poudre <br />diversion north of Fort Collins east to near the town of Galeton northeast of Greeley, generally <br />bounded by the Eaton Ditch and the Greeley Ditch No. 2 Ditch. The total area encompassed is about <br />86,000 acres, providing water for irrigation for about 55,000 acres. WRCC typically uses about <br />31,000 acre-feet to irrigate the 55,000 acres. WRCC owns 6 reservoirs and about 25 miles of ditch <br />known as the Poudre Valley Canal. Reservoir No.8 WaS purchased in 1911. Total decreed storage in <br />all reservoirs is 65,562 acre feet. Windsor Reservoir No. 8 and No, 8 Annex are adjacent, inter- <br />connected, reservoirs that have a storage decree of 15,381 acre-feet, with current storage capacity at <br />12,700 acre-feet due to sediment accumulation. The project would provide an additional 620 acre-feet <br />of storage, allowing WRCC to supply irrigation water for an additional 3 days. This is significant <br />because the total number of days the system normally runs is 30 to 45 days. The removed material <br />will be spread over 30 acres of land adjacent to the reservoir, and re-seeded to address erosion, <br /> <br /> <br />Location Map <br /> <br />Page 6 of 6 <br /> <br />. <br /> <br />\ <br />'. <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.