Laserfiche WebLink
<br />, <br />.' <br /> <br /> <br />RED MESA WARD RESERVOIR AND DITCH COMPANY <br />1290 COUNTY ROAD 102 <br />HESPERUS, COLORAPO 81326 <br />303-588-349~ <br /> <br />& <br /> <br />October 12, 2001 <br /> <br />Mike Serlet <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 718 <br />Denver, Colorado 80203 <br /> <br />Re: Red Mesa Reservoir Enlargement, Feasibility Lolm Contract No. CI53686 <br /> <br />Dear Mike: <br /> <br />The Red Mesa Ward Reservoir and Ditch Cornpany greatly appreciates the assistance of the <br />CWCB is attempting to enlarge the Red Mesa Reservoir. Unfortunately, the Company has found <br />the project not to be feasible because of water right~ issues. Enclosed is the Concluding Report <br />for the project. Therefore, the Company requests t~at the CWCB de-authorize the $2,250,000 <br />construction loan for the project and forgive tht: $15,000 feasibility study loan according to the <br />loan terms. <br /> <br />Enclosed is an invoice from our engineer, Harria Water Engineering, Inc., for $2,363.80 for work <br />on the project since the last invoice in April, 1996. With the attached invoice, the total feasibility <br />study cost is $15,000. ' <br /> <br />e <br /> <br />Please call me (970-588-3495) or Steve Harris, with! Harris Water Engineering (970-259-5322) if <br />you have any qut:stions. ' <br /> <br />J~JeWf~ <br /> <br />Trent Taylor II' <br />Vice President! ! <br /> <br />.e <br />