My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00328
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:41 PM
Creation date
10/4/2006 6:35:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/26/2001
Description
Weather Modification Permit Program
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..,J. <br />....~... <br /> <br />P'qe 4 <br /> <br />(3) EvaluatIng Permit ApplicatIons <br /> <br />tnformatlon provIded on Form WH2 wIll be used by the Executive <br />olrector to decIde (based on the crIterIa In C.R.5.S 36-Z0-112) <br />If a permIt should be granted. <br /> <br />(4) GrantIng of PermIts <br /> <br />Permits shall be granted for a maxlrj1um of one year. ExceptIons <br />may be made for prOjects scheduled ~o last up to 1e months. Per. <br />mlts may be renewed durIng the flve:years followIng the date of <br />Issue providIng condItIons under whIch the permIt was Issued have <br />not changed SUbstantIally. <br /> <br />C. Reports <br /> <br />. <br /> <br />(1) A current, dally log (whIch Includes the Information requIred by <br />Form 101M3) sha.1l be kept by the perm1 the at the project office and <br />I <br />made available for InspectIon by the public In a manner that does <br />not Interfere with the project. <br /> <br />(2) Form WM3 shall be submitted bIweekly to the Executhe DIrector not <br />later than ten days after the end of the reporting perIod. <br /> <br />(3) Annual reports shall be made In accordance with C.R.S. <br />5 36-20-117(3). A wrItten final report whIch evaluates the <br />project shall be submitted to the EXecutive DIrector and to county <br />commIssIon offices (In those counties In whlcn publication of a <br />legal notice of Intent IS requIred) iwlthln 30 days of completIon <br />of the project. <br /> <br />.., <br /> <br />.-. ....- --49(1 <br /> <br />...' ../. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.