My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00291
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:18 PM
Creation date
10/4/2006 6:35:00 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
ISF Section - Statements of Opposition - Case No. 4-98CW247, Mountain Valley Metropolitan District
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Agenda Item 61 <br />Case No. 4-98CW247; Mountain Village Metropolitan District <br /> <br />Aoolication Summary <br /> <br />This is an application for goundwater rights, surface water rights, change of water rights, plan for <br />augmentation and exchange on Vance Creek and Turkey Creek near Telluride in San Miguel <br />County (see attached map). In association with a residential development, Applicant proposes <br />that the Wagner Ditch and the Telco Well No. 3/5A8 First Enlargement as alternate points of <br />diversion for 0.699 cfs of the Agricultural Ditch. The Agricultural Ditch and the Telco Well No. <br />3/5A8 First Enlargement are also proposed to be alternate points of diversion for 0.2 cfs of the <br />Wagner Ditch. Applicant proposes adding the following-uses to the Wagner and Agricultutal . <br />Ditches: Stock, Recreation, fish and wildlife, fire, augmentation, domestic, municipal, <br />commercial and aesthetic. In addition, Applicant proposes an alternate place of use for the <br />Wagner and Agricultural Ditches. Furthermore, Applicant proposes to augment out-of-priority <br />depletions associated with the Telco Well No. 3.5A8 First Enlargement using consumptive use <br />credits associated with the Wagner and Agricultural Ditches or releases from the Skyfield <br />Augmentation Ponds A-D. <br /> <br />CWCB Aoorooriations <br /> <br />The Board has the following instream flow appropriations which could be injured by this <br />application: <br /> <br />Case No. <br />4-84CW427 <br />4-84CW430 <br /> <br />Stream <br />San Miguel River <br />S. FIe. San Miguel River <br /> <br />Amount(cfs) <br />9.0 <br />6.5 <br /> <br />Aooroo. Date <br />7113/1984 <br />7113/1984 <br /> <br />Potential for Ininrv <br />Applicant's proposed change of water rights may deplete the Board's instream flow water rights on <br />the San Miguel River and the South Fork of the SaIl Miguel River. In addition, the proposed plan <br />for augmentation may not replace depletions to the San Miguel River and the South Fork of the San <br />Miguel River in the same time, amount or location at which they occur. <br /> <br />Other Obiectors <br /> <br />Other objectors include the Town ofTelluride, Skyfield Mutual Ditch Company, the Zoline Family <br />. Partnership, Skyfie1d LLC. and Silver Mountain Industries. <br /> <br />L:IBOARDMEM\March 99\agenda item 61.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.