Laserfiche WebLink
<br /> <br /> TARGET AREA SNOTEL PRECIPITATION DURING THE 2002-2003 <br /> OPERATING SEASON (NOV.!, 2002 THROUGH APR. 7, 2003) <br />SNOTEL NORMAL ACTUAL PRECIP. ** EST. ** EST. ** EST. <br />SITE PRECIP. PRECIP. DURING UNSEED PRECIP. PRECIP. <br /> SEASON SEASON SEEDING PRECIP. INCREASE INCREASE <br />ELEV. % NORM. % NORM. % ACTUAL % NORM. % SEEDED % ACTUAL ^ <br />ARROW 13.40" 14.20" 11.90" 13,00" 1.20" 1.20" <br />9,680' MSL 100.0% 106.5% 83,8% 97,0% 10.1% 8.5% <br />BERTHOD 20.60" 22.00" 18,50" 19.65" 2.35" 2.35" <br />SUMMIT 100,0% 106,8% 84,0% 95.4% 12,7% 10,7% <br />11,300' MSL :J~.llLf " rt.,38" ~O,t>q/J :;,701/ :l.7SJ/ <br />4J"nTef P~tI<. 7/.71'" I h ,I?'?o la,,,"'. <br />COPPER MTN, 14.70" 15.80" 12.80" 13,69" 2.11" 2.11" <br />10,500' MSL 100.0% 107.5% 81.0% 93.1% 16.5% 13,4% <br />GRIZZLY PK 16,50" 16,70" 10,80" 15.53" l.lT' LI7" <br />11,100' MSL 100.0% 101.20% (i4.7% 94,1% 10,8% 7.(jOA, <br />HOOSIER PASS 14.00" 13.20" 11.50" 1l.41" 1.79" 1.79" <br />11,400' MSL 100.0% 94.40% 87.1% 81.5% 15.6% 13,6% <br />LOVELAND 15,70" 18.80" 15.9" 16,57" 2.23" 2.23" <br />BASIN 100.0% 119,7% 84,6% 105.5% 14,0% .11.9% <br />11,400' MSL <br />MID, FORK 9,60" 11.70" 10,00" 10.34" '1.36" 1.36" <br />CAMP 100.0% 121.9% 85.5% 107.7% 13.6% 11.6% <br />9,000' MSL <br />MICIDGAN 12.70" 12.90" 9.10" 11.53" L3T' 1.37" <br />CREEK 100,0% 101.60% 70.5% 90,8% 15.1% 10,6% <br />10,600' MSL <br />SUMMIT 12.10" 13.30" 11.20" 11.79" 1.51" 1.51" <br />RANCH 100.0% 109,9% 84,2% 97.4% 13.5% 11.4% <br />9,400' MSL <br />VAILMTN, 20,10" 20,20" 17.40" 17.15" 3.05" 3,05" <br />1 0,300' MSL 100.0% 100.5% 86.1% 85.3% 17.5% 15,1% <br />FREMONT PAS 14.10" 13.90" 10,70" 12,64" 1.26" 1.26" <br />11,400' MSL 100.0% 98,6% 77.0% 89,6% 11,8% 9,1% <br />BRUMLEY 12,20" 9.40" 7,00". 8.31". 1.09" 1.09" <br />10,600' MSL 100.0% 77.0% 74.5% 68,1% 15.6% 11.6% <br />IVANHOE 17,90" 16,90" 1l.40". 15.10". 1.80" 1.80" <br />10,400' MSL 100.0",1, 94.4% 67.5% 84.4% 15.8% 10.7% <br />INDEPEND, 16,80" 14,20" 10.60". 12.50". 1.70" 1.70" <br />PASS 100.0% 84.5% 74,6% 74.4% 16,0% 12.0% <br />10,600' MSL <br />.. Precipitation increase estimates made ntilizing previous research results from the Vail and CRBPP Program results, <br />. Seeding ended on March 25, 2003, <br />