Laserfiche WebLink
<br />. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br /> <br />. <br /> <br />. <br /> <br />SUPPLY DEMANDS, AND OPTIONS FOR ADDRESSING SUCH CONSTRAINTS; <br />(III) INSTITUTIONAL CONS1RAINTS UPON THE USE OF INTERRUPTIB LE <br />SUPPLY PLANS, INCLUDING THE NEED FOR LONG-TERM CERTAINTY IN <br />MEETING WATER SUPPLY DEMANDS; <br />(IV) ADMlNIS1RATIVE CONSTRAINTS UPON THE USE OF <br />lNTERRUPTIBLE SUPPLY PLANS, lNCLUDlNG THE NEED FOR ADDITIONAL <br />ST ATE STAFF TO EFFECTIVEL YMONITOR SUCH ARRANGEMENTS AND ENSURE <br />THAT SUCH ARRANGEMENTS ARE EFFECTUATED IN ACCORDANCE WITH <br />STATE LAW; <br />(V) THE NEED FOR AND PROPOSED NATURE OF ANY NEW RULES <br />NECESSARY TO FACILITATE THE USE OF lNTERRUPTIBLE SUPPLY PLANS; <br />(VI) INTERSTATE COMPACT CONSTRAINTS UPON THE USE OF <br />lNTERRUPTIBLE SUPPLY PLANS SO AS TO MEET FUTURE WATER SUPPLY <br />DEMANDS; <br />(VII) SOCIAL OR ECONOMIC CONSTRAINTS UPON THE USE OF <br />lNTERRUPTIBLE SUPPLY PLANS TO MEETFUrUREW ATER SUPPL YNEEDS; AND <br />(VIII) ANy APPROPRIATE LIMITATIONS UPON THE USE OF <br />lNTERRUPTIBLE SUPPLY PLANS, WITH SPECIFIC REFERENCE TO THE TIME, <br />PLACE, OR TYPE OF USE OF WATERS MADE AVAILABLE UNDER SUCH PLANS <br />AND THE LENGTH OF AGREEMENTS IMPLEMENTING THE SAME. <br />(b) IN ADDITION, THE STATE ENGINEER'S OFFICE SHALL IDENTIFY IN <br />SUCH REPORT THE NATURE, SCOPE, AND LOCATION OF A SUITABLE PILOT <br />PROJECT WITHlN COLORADO THAT COULD BE ESTABLISHED SO AS TO <br />FACILITATE, AS A CONSEQUENCE OF INFORMATION GAINED THROUGH <br />OPERATIONAL EXPERIENCE, THE FUTURE USE OF INTERRUPTIBLE SUPPLY <br />PLANS AS A MEANS TO MEET FUTURE WATER DEMANDS, THE STATE <br />ENGlNEER'S OFFICE SHALL PROVIDE SUCH STUDY REPORT TO THE BOARD ON <br /> <br />-6- <br /> <br />SBOI-161 <br />