Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br /> <br />THE BANK. <br />(3) TIlEPROPOSED CHARTER SHALL SPECIFY CRITERIA PURSUANT TO <br />WHICH THE WATER BANK SHALL: <br />(a) ACCEPT A DEPOSIT OF A QUANTITY OF WATER IN TIlE BANK, <br />INCLUDING NECESSARY PROOF OF: <br />(I) OWNERSHIP OR A CONTRACT THAT INCLUDES THE RIGID' TO USE <br />AND CONTROL THE DISPOSITION OF WATER; AND <br />(II) THE PARAMETERS OF THE WATER SUBJECT TO THE PROPOSED <br />DEPOSIT, WHETHER BY DECREE OR BY CONTRACT; <br />(b) CREDIT A WITHDRAWAL OF A QUANTITY OF WATER FROM THE <br />BANK, INCLUDING THE QUANTITY, TERM, LOCATION, AND TYPE OF THE <br />PROPOSED USE OF THE WITHDRAWN WATER. <br />37-80.5-105. Powers. (1) WATER BANKS SHALL HAVE ALL <br />POWERS SPECIFlEDIN SECTIONS 37-45.1-103 AND29-1-204,2, C.R.S., AND <br />IN THIS ARTICLE, INCLUDING THE FOLLOWING: <br />(a) To AUTHORIZE, FACILITATE, AND PERMIT THE SALE, LEASE, <br />EXCHANGE, AND LOAN OF WATER WITHIN COLORADO; <br />(b) To CHARGE APPLICANTS A 1RANSACTION FEE FOR <br />1RANSACTIONS WITH A WATER BANK; <br />(C) To lMPOSECONCURRENCY MANAGEMENT PLANS ON APPLICANTS <br />FOR 1RANSACTIONS WITH A WATER BANK AS A PRECONDITION OF THE <br />TRANSACTION; AND <br />(d) To REFER TO THE STATE ENGINEER, FOR APPROPRIATE <br />ADMINISTRA TIVEACTION PURSUANT TO THE PROVISIONS OF THIS TITLE, ANY <br />ENTITY WHOM THE WATER BANK HAS REASON TO BELIEVE HAS FAILED TO <br />SUBSTANTIALLY COMPLY WITH THE TERMS OF ANY CONCURRENCY <br />MANAGEMENT PLAN WITH WHICH THE ENTITY HAS AGREED TO COMPLY AS <br /> <br />-19- <br /> <br />SBOI-161 <br />