Laserfiche WebLink
<br /> <br /> 1 PROPOSED TRANSACTION WITII A W A1ER BANK ON AN APPLICANT SEEKING <br />. 2 TO MAKE A DEPOSIT TO OR WITHDRAWAL FROM A WA1ERBANK. THEPLAN <br /> 3 SHALL PREVENT ANY INJURIOUS EFFECT ON THE OWNER OF OR PERSONS <br /> 4 ENTITLED TO USE W A1ER UNDER A VES1ED W A1ER RIGHT OR A DECREED <br /> 5 CONDITIONAL W A1ER RIGHT AND SHALL COMPENSA 1E TIIEBASIN OF ORIGIN <br /> 6 IF THE WITHDRAWN WATER IS TO BE USED IN A WATER DIVISION OTIIER <br /> 7 TIIAN THE W A1ER DIVISION IN WHICH THE WATER BANK IS CHAR1ERED. <br /> 8 (b) CONCURRENCY MANAGEMENT PLANS MAY INCLUDE THE <br /> 9 FOLLOWING: <br /> 10 (I) A LIMITATION ON THE USE OF TIIE WA1ER TIIAT IS SUBJECT TO <br /> 11 THE CHANGE, TAKING INTO CONSIDERATION THE HISTORIC USE AND THE <br /> 12 FLEXIBILITY REQUIRED BY ANNUAL CLIMATIC DIFFERENCES; <br /> 13 (II) THE RELINQUISHMENT OF PART OF TIIE DECREE FOR WHICH THE <br /> 14 TRANSACTION IS SOUGHT OR TIIE RELINQUISHMENT OF OTHER DECREES <br />. 15 OWNED BY TIIE APPLICANT THAT ARE USED BY THE APPLICANT IN <br /> 16 CONJUNCTION WITII TIIE DECREE FOR WHICH THE TRANSACTION HAS BEEN <br /> 17 REQUES1ED, IF NECESSARY TO PREVENT AN ENLARGEMENT UPON TIIE <br /> 18 HISTORIC USE OR DIMINUTION OF RETURN FLOW TO TIIE DETRIMENT OF <br /> 19 OTHER APPROPRIATORS; <br /> 20 (III) A TIME LIMITATION ON TIIE DIVERSION OF W A1ER FOR WHICH <br /> 21 TIIE TRANSACTION IS SOUGHT IN TERMS OF MONTIIS PER YEAR; AND <br /> 22 (IV) SUCH OTIIER CONDITIONS AS MAYBE NECESSARY TO PR01ECT <br /> 23 TIIE VESTED RIGHTS OF OTHERS AND AS MAY BE DEEMED NECESSARY BY <br /> 24 TIIE BANK, INCLUDING MEASURES TIIAT DO NOT RELATE DIRECTLY TO <br /> 25 W ATERMATIERS, SUCHAS TIIE CONSTRUCTION OF CAPITALIMPROVFMENTS <br /> 26 IN THE BASIN OF ORIGIN OR A PAYMENT OF COMPENSATION. <br />. 27 (2) "WA1ER BANK" MEANS A WATER AUTHORITY ESTABLISHED <br /> <br />-17- <br /> <br />SBOI-161 <br />