My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00246
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2010 10:22:11 AM
Creation date
10/4/2006 6:34:01 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/3/1994
Description
Agenda, Minutes, Memos
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />Agenda Item 6a <br />Case No. 5-93CW241; Farmer's Komer, Inc. <br /> <br />Case Summary <br /> <br />The Board ratified the statement of opposition filed in this case af its January 1994 meeting. <br />Applicant is requesting a water right and approval of a plan for augmentation on the Blue River <br />near Dillon Reservoir in Summit County (see attached map). Applicant is proposing to replace <br />summertime out-of-priority depletions from a maximum of 35 junior, conditional wells by <br />exchange with senior consumptive use credits decreed to the Blue Danube Ditch No.2 on the <br />Blue River. Winter depletions will be replaced by exchange with stored consumptive use credits <br />released from Dillon Reservoir. <br /> <br />The Board holds an in stream flow decree for 32 cfs, summer, and 16 cfs, winter, on the Blue <br />River. Applicant's proposed plan for augmentation could injure the Board's instream flow right <br />on the Blue River if it does not comply with the terms of the Summit County/CWCB Upper Blue <br />River Basin Memorandum of Agreement. <br /> <br />Discussion <br /> <br />This case is set for trial on January 18, 1995. Staff is currently working with the Attorney <br />General, the applicant and the State Engineer's Office (SEa) on language for a stipulation that <br />will provide 100 percent protection for the Board's Blue River in stream flow water right. Staff <br />has met with the applicant, applicant's engineer ilIld SEa staff to resolve this case. Return flow <br />issues are still unresolved at this time, however, staff expects to resolve these concerns prior to <br />trial. <br /> <br />File: c;\wp51\board.mem\apt\593CW241.apt <br />
The URL can be used to link to this page
Your browser does not support the video tag.