Laserfiche WebLink
<br />.~ <br /> <br />'. <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />Agenda Itern 19b <br />September 12, 1991 <br /> <br />Potential for Injury <br /> <br />Return flows from the Wastewater Treatment Plant may not be sufficient in arnount, <br />timing or location to replace depletions to the Washington Gulch drainage. Furthermore, <br />the proposed upstream exchange to the East River Pump Station could injure the Board's <br />right on the East River if the exchange is not administered as having a 1991 adjudication <br />date. <br /> <br />Other Objectors <br /> <br />The only other objector in this case is the City of Gunnison. <br /> <br />Staff Recommendation <br /> <br />The staff recommends that the Board ratify the statement of opposition filed in this <br />case to protect the Board's instream flow rights on the above-rnentioned streams. <br /> <br />DCM/JB/gl <br />Attachment <br /> <br />491CW049.SOP <br /> <br />-2- <br />