<br />I <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Dolores Water Conservancy District - WETPACK iI <br />January 25-26. 2004 <br /> <br />Agenda Item 20a <br /> <br />crops to be raised are alfalfa, beans and small grains. The Selected Plan consists of construction <br />for the Yellow Jacket East area to irrigate 1,011 acres and for the Pleasant View East area to <br />irrigate 1,189 acres. The new land will be served in the same manner as existing Project irrigated <br />land, with delivery boxes for each 160 acres (or less) providing at least 45 psi of pressure and 5.6 <br />gpm per acre at the high point of the field to operate sprinkler systems. Major facilities will include: <br />. Yellow Jacket East - A new pump station along the Dove Creek Canal, approximately <br />10,560 feet of pipe ranging in size from 10 inches to 16 inches, and 9 delivery boxes. <br />. Pleasant View East - A new pump station along the Doye Creek Canal, approximately <br />15,840 feet of pipe ranging in size from 10 inches to 24 inches, and 12 delivery boxes. <br /> <br />Reyised cost estimates haye been prepared, and the total project cost is estimated to be: <br /> <br />1. <br />2. <br />3. <br /> <br />Engineering Costs (non-OW CD) <br />Construction -Yellow Jacket East <br />Construction - Pleasant View East <br />TOTAL <br /> <br />$ 107,535 <br />$1,336,890 <br />$2,247.575 <br />$3,692,000 <br /> <br />The construction designs will be prepared by DWCD engineering staff, and DWCD will either utilize <br />in-house construction crews or bid the work, depending on cost and availability of in-house <br />personnel. An Environmental Assessment has been prepared by the USBR for the carriage of non- <br />Project water through the Doye Creek Canal, and Army Corps of Engineers 404 permits will be <br />obtained as necessary. The proposed schedule is as follows: <br /> <br />. Complete 440-acre Sandstone West project <br />Close existing CWCB Loan <br />. Yellow Jacket East - Begin Construction <br />- Complete Construction <br />Pleasant View East - Begin Construction <br />- Complete Construction <br />Close new CWCB Loan Loan <br /> <br />July 2005 <br />December 1, 2005 <br />Spring, 2006 <br />Summer, 2007 <br />Spring, 2007 <br />Summer, 2008 <br />December 1, 2008 <br /> <br />Financial Analvsis <br /> <br />The total estimated cost of the project is $3,692,000. For this project the DWCD would qualify for <br />the agricultural interest rate. Staff is recommending a loan for a maximum amount of $3,323,180 <br />(90% of estimated project cost) for 30 years at an interest rate of 2.5 % per annum. DWCD will <br />provide $368,820, the local match needed for their portion of the project, through WETPACK <br />participation fees of $250 per acres collected from landowners. <br /> <br />Table 2 is a summary of the financial aspects of the project. A CWCB loan of $3,323,180 would <br />have an annual payment of $158,774 at the loan terms of 2.50% for 30 years. <br /> <br />T bl 2 F . I S <br /> <br />a e . mancla ummary <br />Existina Proiect Cost (Loan #1) $2,881,000 <br />Existina CWCB Loan #1 Amount (30 vears) - At Close Out $2,530,000 <br />Existina CWCB Loan #1 Annual Pavment $137,559 <br />New Proiect Cost (Loan #2) $3,692,000 <br />New CWCB Loan #2 Amount (30 vears) $3,323,180 <br />New Annual Loan #2 Annual Pavment $158,774 <br />Number of Irriaators 13 <br />Number of Acres Irriaated 2892 <br />Annual Cost of Both Loans oer ac-ft (ayer. annual deliverv: 6000 ac-ft.) $49.39 <br /> <br />Page 5 of 6 <br />