CF Section - Severance Tax Trust Fund Perpetual Base Account New Loans - Town of Monument - Monument Dam Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROJECT SUMMARY <br /> <br />Rehabilitation of Monument Lake Dam <br />Town of Monument <br /> <br />Prolect: ~ehabilitation of Monument Lake Dam <br /> <br />Proiect Sponsor: Town of Monument <br /> <br />Amount of Loan Requested: $2,081,000 from the Perpetual Base Account of the <br />Severance Tax Trust Fund <br /> <br />Tvpe of Prolect: Recreational, rehabilitation of an existing dam <br /> <br />Location: In the Town of Monument <br /> <br />'Prolect Description: The project involves rehabilitation of the spillway, the outlet works <br />and the dam embankment to include: (1) replacement of the existing spillway chute <br />below Ute spillway crest, (2) removal and replacement of the top 10 feet of the dam <br />embankment to clear all vegetation and installing au internal drainage system in the <br />embankment, and (3) replacement of the existing outlet works with a new :24-inch steel <br />pipe placed on bedrock below the embankment. The Town also proposes to remove about <br />150,000 cubic yards of sediment from the bottom of the reservoir by dredging. <br /> <br />Schedule: Phase 1, which involves the spillway work, begins in February 2001 and ends <br />in May 2001. Phase 2, the embankment and outlet works, will begin in September of <br />2001 and be completed in March 2002. <br /> <br />Total Estimated Proiect Cost: $3,081,000 <br /> <br />Monument Reservoir Location Map <br /> <br />391 <br /> <br /> <br />" , <br /> <br />I <br />\ <br />, <br />.> .... <br />if - <br />